Similar Projects
Facility New Construction, Additions and Renovations - 2020 Bond - Platteville Public Schools
Addition, New Construction, Infrastructure, Renovation
Conception
$36,000,000 CJ est. value
Platteville, WI 53818

Facility New Construction, Additions and Renovations - 2020 Bond - Platteville Public Schools
Addition, New Construction, Infrastructure, Renovation
Conception
$36,000,000 CJ est. value
Platteville, WI 53818

Cuba City School District 2022 Bond - Elementary and High School
Addition, Demolition, Renovation, Infrastructure
Design
$36,000,000 CJ est. value
Cuba City, WI 53807

Dickeyville - Lancaster Const / Passing Lanes and Slopes / Misc
Infrastructure
Design
$7,000,000 CJ est. value
Lancaster, WI 53813

Sealcoating
Infrastructure
Bidding
$100,000 CJ est. value
Potosi, WI 53820

Sealcoating
Infrastructure
Bidding
$100,000 CJ est. value
Potosi, WI 53820

Snowplowing Bids
Infrastructure
Post-Bid
Muscoda, WI

Snow Plowing Bids
Infrastructure
Post-Bid
Muscoda, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Scot Substation Earthwork
Infrastructure
Results
Muscoda, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Scenic Rivers Energy Cooperative Headquarters Building
New Construction, Infrastructure - 56,000 SF
Pending Verification
$7,000,000 CJ est. value
Lancaster, WI 53813

Scenic Rivers Energy Cooperative Headquarters Building
New Construction, Infrastructure - 56,000 SF
Pending Verification
$7,000,000 CJ est. value
Lancaster, WI 53813

University Farm Road
Infrastructure
Bidding
$300,000 CJ est. value
Beetown, WI 53813

Last Updated 03/05/2023 04:31 AM
Project Title

Jefferson Street 2023 Reconstruction

Physical Address View project details and contacts
City, State (County) Platteville, WI 53818   (Grant County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $959,730 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: Jefferson Street from Madison Street north to cul-de-sac and easement area between Jefferson Street and Kase Street. The Project consists of reconstructing approximately 775 lineal feet of Jefferson Street from Madison Street north to the cul-de-sac. Work to be completed includes replacing 8" sanitary sewer; installing new 8" water main; replacing storm sewer; and full street reconstruction. The Project also includes replacing sanitary sewer and storm sewer through and easement area from Jefferson Street to Kase Street. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least five percent (5%) of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the Bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the Bidder as soon as the contract is signed. If after 15 days the Bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. BIDDER is required to deliver the original certified check or bid bond within 72 hours of bid opening to Delta 3 Engineering, Inc., Attn: Dan Dreessens, 875 S. Chestnut Street, Platteville, Wisconsin 53818. Bids may not be withdrawn within 90 days after the date of the bid opening. The OWNER reserves the right to increase or decrease the quantity of any item or portion of the work, or to omit portions of the work, as may be deemed necessary by the OWNER, and the same shall in no way affect or make void the contract, except those additions to, or deductions from, the contract price will be appropriately made. The OWNER reserves the right to waive any informalities, or to reject any or all bids, or any part of a bid, and to award the Contract to the Bidder, who in the judgment of the OWNER, will best serve the interest of the OWNER.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents