Similar Projects
Olympic View Development
New Construction, Infrastructure - 1,600,000 SF
Conception
$854,000,000 CJ est. value
Park City, UT 84060

Olympic View Development
New Construction, Infrastructure - 1,600,000 SF
Conception
$854,000,000 CJ est. value
Park City, UT 84060

Yarrow Park City Mixed-Use
Demolition, New Construction, Infrastructure - 5,000 SF
Design
$116,000,000 CJ est. value
Park City, UT 84060

Yarrow Park City Mixed-Use
Demolition, New Construction, Infrastructure - 5,000 SF
Design
$116,000,000 CJ est. value
Park City, UT 84060

RFP - Mine Bench Workforce Housing Development
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Park City, UT 84060

Drilling and Installation of an Agricultural Well at the Kamas Cemetery
Infrastructure
Bidding
$210,000 CJ est. value
Kamas, UT 84036

Mountain Life Church Expansion
New Construction, Addition - 45,956 SF
Post-Bid
Park City, UT 84098

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Udot Region 4 Wash Rack Installation Various Locations
Term Contract, Infrastructure
Results

UDOT Wanship MS4 Project
Term Contract, Infrastructure
Results
Wanship, UT

Harmons at the Junction
Demolition, New Construction, Infrastructure - 76,000 SF
Pending Verification
$20,000,000 CJ est. value
Park City, UT 84098

Harmons at the Junction
Demolition, New Construction, Infrastructure - 76,000 SF
Pending Verification
$20,000,000 CJ est. value
Park City, UT 84098

Munchkin Extension/Multi Trail and Woodbine Improvement - CP0528 - City of Park City
Infrastructure
Conception
$1,858,825 CJ est. value
Park City, UT 84060

Drilling and Installation of an Agricultural Well at the Francis Cemetery
Infrastructure
Bidding
$80,000 CJ est. value
Kamas, UT 84036

Clark Ranch Project
Infrastructure
Post-Bid
Park City, UT

Last Updated 01/18/2023 08:49 AM
Project Title

SR-150; SR-32 to Samak

Physical Address View project details and contacts
City, State (County) Samak, UT 84036   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $780,855 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

County: Summit For questions contact the Civil Rights Office. This Project Requires Using the Electronic Certified Payroll Program. See Attachment to Notice to Contractors. This is a P+t (Price + Time) Project. The Department Will Not Hold Retention on This Project. Per Utah State Code A 13-8-5 (1) Prime Contractors Cannot Hold Retention. Refer to Utah Code A 13-8-5 (1) for More Information. Wage Rates: Apply Engineer's Estimate: Greater than $500K but less than or equal $1.5M Project Location: SR-150; SR-32 to Samak The principal items of work are as follows (for all items of work see attachment): Emulsified Asphalt CRS-2P Chip Seal Coat, Type II Traffic Control The project is to be completed: to be determined by competitive bid Project information can also be reviewed at the main office in Salt Lake City, its Region offices, and its District offices in Price, Richfield, and Cedar City. Each bidder must submit an electronic bid bond from an approved surety company using UDOT's Electronic Bid System (EBS); or in lieu thereof, cash, certified check, or cashier's check for not less than 5% of the total amount of the bid, made payable to the Utah Department of Transportation, showing evidence of good faith and a guarantee that if awarded the contract, the bidder will execute the contract and furnish the contract bonds as required. The right to reject any or all bids is reserved. Additional information may be secured at the office of the Utah Department of Transportation, (801) 965-4346 UDOT - SR-150; SR-32 to Samak Preservation High Volume *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents