Similar Projects
Wildhorse Ranch Wastewater Treatment Plant Expansion
Addition
Conception
$35,000,000 est. value
Austin, TX 78653

Dessau Wastewater Treatment Plant Capacity Expansion
Addition
Conception
$8,650,000 est. value
Austin, TX

Wilbarger Creek Wastewater Treatment Facility
New Construction
Design
Pflugerville, TX

Onion Creek Odor Control Facility Stream Bank Stabilization - 6943.050 - City of Austin
Infrastructure
Design
$521,500 CJ est. value
Austin, TX 78701

Wild Horse Ranch Wastewater Treatment Plant Expansion
Addition, Demolition, Infrastructure
Bidding
$48,970,000 CJ est. value
Manor, TX 78653

Construction of the Wastewater Treatment Plant Phase 1 Repairs and Upgrades
Renovation
Bidding
$300,000 CJ est. value
Austin, TX 78701

Stallion Run Wastewater Treatment Plant and Offsite Wastewater Line
New Construction
Post-Bid
$4,000,000 est. value
Austin, TX

Water Treatment Plant Expansion Project
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Pflugerville, TX 78660

North Waste Water Treatment Plant Headworks Replacement Project
Results
Austin, TX

Windmill Ranch WWTP MBR Rehabilitation
New Construction
Results
Austin, TX

South Austin Regional WWTP Trains A & B Improvements
Renovation
Conception
$78,230,000 est. value
Austin, TX 78799

South Area Lift Station Improvements: Springfield Lift Station - 3168.125 - City of Austin
Renovation
Design
$1,380,800 CJ est. value
Austin, TX 78701

Hornsby Bend BMP Process Ammonia Removal Facility
Renovation
Post-Bid
$7,100,000 CJ est. value
Austin, TX 78701

Wastewater Treatment Plant Expansion to 1.0 Mgd
Renovation
Results
$12,200,000 est. value
Manor, TX 78653

Reverse Osmosis Deionization Water System Maintenance Services
Renovation
Results
$49,890 est. value
Austin, TX

Last Updated 09/09/2022 03:06 PM
Project Title

Walnut Creek WWTP Gas Scrubber System Renewal

Physical Address View project details and contacts
City, State (County) Austin, TX 78724   (Travis County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $6,275,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Several components in the chlorination and de-chlorination facilities must be replaced or rehabilitated. These components include the following: chlorine scrubber, building ventilation system, building lighting, leak detection, fire safety, electrical, instrumentation, and SCADA; and the sulfur dioxide dichlorination building ventilation system, building lighting, leak detection, fire safety, electrical, instrumentation, and SCADA. MBE/WBE Goals: African Americans 1.65% Hispanic 3.11% Combined Native/Asian .86% Combined MBE/WBE- 1.21%

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents