Similar Projects
Redding Fire & Ems Company
New Construction, Demolition
Design
Redding, CT

Elevator Modernization
Renovation
Bidding
Waterbury, CT 06702

Fire Training Burn Building
New Construction
Bidding
$410,000 est. value
New Milford, CT

Additions and Alterations to Monroe Volunteer Emergency Medical Service
Renovation, Addition - 11,614 SF
Post-Bid
Madison, Monroe, CT 06468

Additions and Alterations to Monroe Volunteer Emergency Medical Service
Renovation, Addition - 11,614 SF
Post-Bid
Madison, Monroe, CT 06468

South Fire District Building Renovations
Renovation, Addition - 2,993 SF
Results
$800,000 est. value
Middletown, CT 06457

Windsor Fire Department and EMS - Additions and Renovations
Renovation, Addition
Results
$10,482,404 est. value
Windsor, CT 06095

New South End Boys & Girls Club
New Construction - 32,000 SF
Construction
$12,000,000 est. value
Hartford, CT 06105

Norwich Police Department Detention Area Renovation
Renovation
Post-Bid
Norwich, CT

Detention Cell Improvements at Plainfield Police Department
Renovation
Results
$100,000 est. value
Plainfield, CT 06374

General Contractor Service for the New North Branford Police Department
New Construction - 17,500 SF
Post-Bid
$6,500,000 to $7,000,000 est. value
Northford, CT 06472

Renovations to the Hartford Police Department's Locker Rooms (SC)
Renovation
Results
Hartford, CT

Construction Services for Police Station Locker Room Renovations
Renovation
Post-Bid
Manchester, CT 06040

DSET Training Area State Police Academy
Renovation - 2,875 SF
Results
$536,600 est. value
Meriden, CT 06450

Sisson Avenue Firehouse 11 Renovations
Renovation
Results
Hartford, CT 06105

Last Updated 01/26/2022 10:31 AM
Project Title

Locker Room Renovation at Madison Police Department

Physical Address View project details and contacts
City, State (County) Madison, CT 06443   (New Haven County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project area is limited to the existing Men’s and Women’s locker areas only and does not extend into toileting, shower, washing areas or common hallway areas. Work shall include field measurements of both Men’s and Women’s locker room. Full engineered design with layouts and interior configuration of new locker units required for review and approval with Police Department personnel and Owners Project Manager prior to order placement. Existing fifty (50) metal storage lockers shall be removed and disposed of. New design should adhere as closely to existing floorplan layout as possible and include a minimum of forty-one (41) Men’s room storage lockers and seven (7) Women’s room storage lockers. The Town, Police Department and Owners Project Manager are open to workshopping the proposed locker units, make and model, number of individual units and layouts to maximize the usability for the Police Department.

Details

Fire/Police Station, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents