Similar Projects
2020 Sidewalk Trip Hazard Maintenance Program
Term Contract
Post-Bid
Less than $80,000 est. value
Bountiful, UT

Concrete Replacement Project
Post-Bid
Woods Cross, UT 84087

Removal and Construction of Concrete Curb and Sidewalk at Multiple Locations City
Results
Less than $100,000 est. value
West Bountiful, UT 84087

SR-193 920 East to 1700 East Sidewalk
Results
Less than $125,000 est. value
Layton, UT 84041

Sunset Drive Curb, Gutter and Sidewalk Phase 2
Post-Bid
Kaysville, UT 84037

DFCM Construction - UHP Farmington Bldg Parking Lot Expansion and Security Measures
Results
$212,000 est. value
Farmington, UT 84025

Corporation Founders West Parking Lot Improvement Project
Post-Bid
Syracuse, UT 84075

West Hill Field Road Sidewalk Improvements, Project
Results
Less than $90,000 est. value
Layton, UT 84041

DFCM Construction - VBS Design/Build - WSU Noorda A2 Lot & Paid Parking Lot
Post-Bid
Less than $3,308,642 est. value

DFCM Construction - General Contractors-DWR EWEC Boardwalk and Hasenyager Trail
Results
$140,000 est. value
Farmington, UT 84025

Bonneville Shoreline Design and Construction
Post-Bid
UT

Layton Sidewalk Improvements
Results
Less than $100,000 est. value
Layton, UT 84040

New Neighborhood Park
Post-Bid
Less than $1,400,000 est. value
Layton, UT 84041

2020 City-Wide Concrete Repair Project
Results
Less than $265,053 est. value
Fruit Heights, UT 84037

Layton City New Neighborhood Park
Addition
Post-Bid
$1,400,000 est. value
Layton, UT 84041

Last Updated 06/15/2020 10:15 AM
Project Title

2020 Replacement and New Construction of Sidewalk, Curb and Gutter and Storm Drain Facilities at Random Locations

Physical Address View project details and contacts
City, State (County) Bountiful, UT 84010   (Davis County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $606,154
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement and new construction of curb, gutter sidewalk, drive approaches, concrete pavement, installation of storm drain facilities and piping at random locations in Bountiful City.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents