Similar Projects
Felida Park Parking Lot Expansion and Childrens Garden Playground
Renovation, Infrastructure
Bidding
$600,000 to $850,000 est. value
Vancouver, WA

Hockinson Meadows Community Park Disc Golf Course and Pedestrian Bridge
Infrastructure
Bidding
$400,000 to $450,000 est. value
WA

Garrison Middle School Sidewalk Improvement
Infrastructure
Post-Bid
Walla Walla, WA 99362

Curb Management Plan
Infrastructure
Post-Bid
$150,000 to $225,000 est. value
Bellevue, WA 98007

Nugget Park Sidewalk Replacement
Infrastructure
Results
$275,000 to $350,000 est. value
Brier, WA 98036

2021 Sidewalk And ADA Improvements
Infrastructure
Results
$200,000 to $300,000 est. value
Auburn, WA 98092

SR 525, Mukilteo Pedestrian and Traffic Improvements MP 8.32 to MP 8.43
Infrastructure
Bidding
WA

I-5, NB Marine View Drive to SR 529 - Corridor and Interchange Improvements Project
Infrastructure
Post-Bid
WA

Fisherman's Harbor Commercial Development Parcels A8 & A17
New Construction, Infrastructure, Alteration - 6,000 SF
Results
$4,300,000 to $4,700,000 est. value
Everett, WA 98213

Sidewalks Package
Infrastructure
Bidding
Seattle, WA

Ephrata Headquarters Pedestrian Crosswalk Replacement
Infrastructure
Post-Bid
$90,000 est. value
Ephrata, WA

Engineering Services for Parking Lot And Trailhead Development & Stormwater Management Plan
New Construction, Infrastructure
Results
Blaine, WA 98230

Parkview Safe Routes to School
Term Contract
Bidding
Bellingham, WA

Parking Lot Preservation Phase Two
Alteration
Post-Bid
$846,000 to $951,000 est. value
Tumwater, WA 98501

Remove and Replace Existing Sidewalk Panels with Glass Inserts
Infrastructure
Results
Roslyn, WA 98941

Reported 11/16/2021 12:00 AM
Project Title

Demolition and Parking Lot Construction Engle Road

Physical Address View project details and contacts
City, State (County) Coupeville, WA 98239   (Island County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes 4 separate items: Water main abandonment, demolition of a concrete cistern, grading the site and creating a gravel parking lot and installing a culvert at the driveway access.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents