Similar Projects
Last Updated | 03/31/2023 07:35 AM |
Project Title | Camp Road Middle School Condensate Drain Repair |
Physical Address | View project details and contacts |
City, State (County) | Charleston, SC 29412 (Charleston County) |
Category(s) | Education, Sewer and Water |
Sub-Category(s) | Middle/Senior High School, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $104,700 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Camp Road Middle School Condensate Drainage Repair - Scope of Work includes, but is not limited to, the repair of the condensate drain-lines, at Camp Road Middle School, as shown and specified on drawing C301A issued by Hussey Gay Bell. Location- 1825 Camp Road Middle School Charleston, SC 29412. The first day the contractor will have access to the site will be April 3, 2023 and Substantial Completion by May 28, 2023. Final Completion (15 Calendar Days After Substantial Complete) June 12, 2023. Question Deadline 03/15/2023 at 1:00 PM ET Submit via e-mail - lawrence_lutrario@charleston.k12.sc.us 1. Scope of Work includes, but is not limited to, the repair of the condensate drain-lines as shown and specified on drawing C301A issued by Hussey Gay Bell. 2. Contractor to schedule his work in accordance with all noise ordinances per the authority having jurisdiction 3. Contractor shall maintain the construction entrances. This shall include (but not necessarily be limited to) grading, filling of ruts and potholes, and maintaining proper drainage. Maintenance of entry gates shall also be the Contractor's responsibility. Adjacent public streets, sidewalks, curbs, and parking lots shall be swept, scraped, washed and kept clean daily (more often as necessary) throughout all operations. 4. Contractor to schedule his work in accordance with all noise ordinances per the authority having jurisdiction. 5. Contractor is responsible for grounds maintenance along the perimeter fence and at all lay-down, staging, storage, and spaced within the area of Work. 6. Contractor shall provide a project specific safety plan prior to mobilization. MBE (20%) |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |