Project Title | Airport Terminal Area Redevelopment Phase I |
Physical Address | View project details and contacts |
City, State (County) | Napa, CA 94559 (Napa County) |
Category(s) | Heavy and Highway, Sewer and Water, Transportation |
Sub-Category(s) | Airline/Passenger Terminal, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $3,343,393 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Airport Terminal Area Redevelopment Phase I: There are three (3) Bid Schedules included for this Project. The scope of work for each consists of the following: Bid Schedule A - Airport Electrical Improvements o Bid Schedule B - Sanitary Sewer Improvements o Bid Schedule C - Terminal Building Demolition ENGINEER'S COST ESTIMATE: The estimated cost of construction for this Project is listed below for each Bid Schedule. Bid Schedule A: $1,053,160 Bid Schedule B: $365,600 Bid Schedule C: $327,500 All questions must be mailed (certified mail) or e-mailed by September 12, 2023, to Alex Radovanovich at alex.radovanovich@meadhunt.com or Mead & Hunt, Inc, Attn: Alex Radovanovich, 1360 19 th Hole Drive, Suite 200, Windsor, CA 95492. No questions will be accepted after this date. No response will be given to questions received by phone. There are three (3) Bid Schedules included for this Project. The scope of work for each consists of the following: o Bid Schedule A - Electrical Improvements Consisting of: o Demolition of the existing electrical vault building and abandoned well, including hazardous abatement o Removal of the existing emergency back-up generator o Removal of the existing rotating beacon and tower, including hazardous abatement o Installation of airfield electrical equipment in existing room within 2000 Airport Road building, using existing PG&E service o Extension of airfield electrical systems to the proposed electrical room o Installation of lighting control equipment via radio connection between Air Traffic Control Tower (ATCT) and proposed electrical room o Connection of existing 2000 Airport Road building emergency back-up generator to proposed electrical room o Relocation of the solar connection from the existing electrical vault building to a new circuit breaker in the 2000 Airport Road building o Installation of new roof-mounted rotating beacon on the 2000 Airport Road building o Relocation of existing Airport access gate (Gate 4) to new location north of Gate 5, and extension of electrical infrastructure to the new gate location o Bid Schedule B - Sanitary Sewer Improvements Consisting of: o Abandonment of existing sewer pipelines and sewer manhole structures o Installation of 8-inch sewer main pipeline, precast sewer manhole structures, and stub outs for future laterals o Bid Schedule C - Terminal Building Demolition Consisting of: o Installation of temporary Air Operations Area (AOA) fence to replace existing Airport Terminal Building o Demolition of existing Airport Terminal Building, including hazardous abatement PW 23-29R-A, PW 23-29R-B, AND PW 23-29R-C The estimated cost of construction for this Project is listed below for each Bid Schedule. Bid Schedule A: - PW 23-29R-A: $1,053,160 Bid Schedule B: - PW 23-29R-B: $365,600 Bid Schedule C: - PW 23-29R-C: $327,500 |
||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |