Similar Projects
Interceptor Sewer Rehabilitation Phase 3
Infrastructure
Bidding
Union Beach, NJ

2020 Annual Contract for Sanitary Sewer System and Service Lateral Repairs
Term Contract
Post-Bid
Belford, NJ 07718

Installation and Repair of Water and Sewer Mains
Post-Bid
Red Bank, NJ 07701

Phase 15 Sanitary Sewer Rehabilitation
Results
$185,663 est. value
Neptune, NJ

Emergency Repairs
Results
$331,505 est. value
Monmouth Beach, NJ

Furnish and Deliver Air Release Valves
Post-Bid
Union Beach, NJ 07735

Two (2) Channel Monster Model CMD2410-XDS2.0
Results
$49,816 est. value
Manalapan, NJ 07726

Improvements Locust Street
Post-Bid
Highlands, NJ 07732

Sanitary Sewer Rehabilitation
Results
$69,854 est. value
Freehold, NJ 07728

2021 Annual Contract for Sanitary Sewer System Repairs and Service Lateral Installations
Post-Bid
Long Branch, NJ 07740

Sanitary Sewer Cleaning and TV Contract
Term Contract
Results
Manalapan, NJ 07726

Professional Servicing and Maintenance of Sewer System
Post-Bid
Tinton Falls, NJ 07724

Crawford Avenue Sanitary Sewer Replacement Phase 2
Results
$159,159 est. value
Shrewsbury, NJ 07702

Septic Disposal Field Construction
Infrastructure
Post-Bid
Millstone, NJ 08510

White Street Improvements
Results
$975,975 est. value
Red Bank, NJ 07701

Last Updated 07/15/2021 09:44 AM
Project Title

Matawan Force Main Repairs at Clark Street

Physical Address View project details and contacts
City, State (County) Union Beach, NJ   (Monmouth County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work generally includes the following: Implement traffic control and detours for eastbound traffic on Clark Street. Perform site preparation and test pits, excavate to the 24" prestressed concrete cylinder pipe (PCCP) Pipe Segment 446, and provide sheeting and shoring to prepare the Pipe Segment for external testing by others and repair the Pipe Segment with specialty external repair banding furnished by the Owner. Perform all work necessary to remove the air release valve (ARV) and isolation valve assembly at manhole Sta. 18+90 and replace the ARV and isolation valve assembly furnished by the Owner.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents