Similar Projects
Last Updated | 10/17/2023 04:09 AM |
Project Title | DFCM Construction-Pre Qualified General-UNG CW Bldg. 5131 MSTC Remodel-23426480 |
Physical Address | View project details and contacts |
City, State (County) | Bluffdale, UT 84065 (Salt Lake County) |
Category(s) | Government/Public |
Sub-Category(s) | Military Facility |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Bidding, Construction start expected December 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,100,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Question Submission Close Date 10/19/2023 3:00 PM MDT ONLY FIRMS PRE-QUALIFIED DURING STAGE I OF THE RFS ARE ALLOWED TO BID ON THIS PROJECT The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the construction of the following project: CAMP WILLIAMS BLDG. 5131 MSTC REMODEL UTAH NATIONAL GUARD CAMP WILLIAMS - BLUFFDALE, UTAH DFCM PROJECT #23426480 Project Description: Interior remodel to meet users current needs; update existing plumbing, mechanical, and electrical systems; update toilet rooms for accessibility; update exterior building finishes. Project Description/Base Bid: Interior remodel to meet users current needs; update existing plumbing, mechanical, and electrical systems; update toilet rooms for accessibility; update exterior building finishes. Additive Alternate No. 1: Remove existing asphalt composition shingles and underlayment and replace with new prefinished standing seam metal roofing over ice and water shield. Refer to roof plan and details on sheet A-400 Additive Alternate No. 2: Apply EFIS wall finish over ALL existing exterior CMU walls. Refer to elevations on sheet A-200. Additive Alternate No. 3: Cut and remove existing 10" Conc. Floor slab in validation rooms and replace with new 4" conc. Slab over 6" + additional gravel base. Slab to be reinf. With 1.9x1.9/6"x6" WWM. Slpe slab to new floor drains. Construction Cost Estimate: $2,100,000.00 |
||||||||||||||||||||||||||||||||||||
Details | 1 Story Above Grade, 36,000 SF.
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |