Similar Projects
Morphy Avenue Substation Site Work
Infrastructure
Results
$378,086 est. value
Fairhope, AL

Spanish Fort High School Baseball Drainage and Other Improvements
New Construction, Addition
Results
$94,755 est. value
Bay Minette, AL

Gulf of Mexico Artificial Reef Construction Project
Results
Gulf Shores, AL

Summit Drive NRCS EWP Project
Infrastructure
Results
Fairhope, AL

Drainage Improvements for Oak Street and Section Street at Bid Mouth Gully
Results
Less than $233,415 est. value
Fairhope, AL 36532

Fels Avenue and Pier Avenue Drainage Improvement Project
Infrastructure
Results
$67,226 est. value
Fairhope, AL 36532

Drainage Improvements on CR 11
Infrastructure
Bidding
AL

Alabama Point Seawall Repair Design
Term Contract, Infrastructure
Post-Bid
$2,488,000 est. value
Orange Beach, AL

Provision of Corrugated Round and Arch Bituminous Coated (Metal) Pipe
Results
AL

Gulf of Mexico Artificial Reef Construction Project
Results
Gulf Shores, AL

Drainage Rehabilitation (Materials Only)
Post-Bid
Robertsdale, AL

Wakefield Canal Restoration
Infrastructure
Post-Bid
Spanish Fort, AL 36527

Stream and Drainage Cleanout
Term Contract
Post-Bid
Foley, AL

Construction Pipe and Culvert Procurement
Results
Foley, AL

City-Wide Drainage Maintenance FY 2021
Infrastructure
Results
$150,000 est. value
Gulf Shores, AL

Last Updated 12/10/2021 09:06 AM
Project Title

Quail Creek NRHS Project

Physical Address View project details and contacts
City, State (County) Fairhope, AL   (Baldwin County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $399,702
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of: Regrading of an existing 260 LF drainage ditch, filling scour holes while improving the existing ditch to a 30 ft. wide bottom (1,800 cy of excavation, 300 cy of borrow) that will be lined with a combination of class III rip-rap (1,600 tons) and tied concrete block erosion control mat (6,075 square feet). An existing downstream concrete cart path will be removed and repoured to proposed elevations. Existing culverts under the cart path will be removed and reset in addition to new culverts proposed (128 LF of 44"x27" RCAP) to improve drainage flow.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents