Similar Projects
Furniture (Building 254)
Term Contract
Bidding
Portsmouth, NH

Furniture (Building 262)
Term Contract
Bidding
Newington, Portsmouth, NH 03801

Professional Shelving and Fixture Services
Term Contract
Post-Bid
Concord, NH

DoDEA Life Cycle Replacement for School and Office Furniture
Post-Bid
$250,000 to $15,000,000 est. value

UNH DeMeritt Hall Chair Reupholstering and Carpet Replacement
Results
Durham, NH 03824

Bathroom Partition at Belmont Elementary School
Results
Belmont, NH 03220

Furniture Building 252
Term Contract
Bidding
Newington, NH 03801

Furniture
Post-Bid
Concord, NH

File Room Shelving Units/Tracking System
Results
Portsmouth, NH

FN1505-20 Furniture Components Installation Services
Post-Bid
Washington, DC

Furniture, Bld 253
Results

DPW Facility Furnishings
Post-Bid
Rochester, NH

Spaulding High School Auditorium Drapery Replacement
Results
Rochester, NH 03867

Furniture FMSD
Post-Bid
$10,000 to $10,000,000 est. value

Systems Furniture & Installation
Post-Bid
Washington, DC

Last Updated 08/06/2021 10:56 AM
Project Title

Sullivan House Furniture

Physical Address View project details and contacts
City, State (County) Claremont, NH 03743   (Sullivan County)
Category(s) Single Trades
Sub-Category(s) Furnishings
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project is to design, provide, and install furniture for Sullivan House located at 19 Sullivan Street in Claremont, New Hampshire. Sullivan House is a 30-bed post-treatment residential community overseen by the Sullivan County Department of Corrections. The facility includes mostly double, but some triple, bedrooms, an office, conference rooms, living and dining area, and several lounge and study spaces. A complete renovation is being done to the existing 3-story building that was formerly occupied by The Eagle Times newspaper. Where possible, the existing industrial aesthetic has been maintained with exposed steel beams and wood ceilings. Flooring consists mostly of luxury vinyl plank with some areas of stained concrete and carpet. Occupancy is expected September 24, 2021.

Details

Division 12 - Furnishings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents