Similar Projects
US 11 - Utilities
Infrastructure
Conception
$1,000,000 CJ est. value
Ponca City, OK 74601

Bridge and Approaches - SH 156
Infrastructure
Design
$2,000,000 CJ est. value
Ponca City, OK 74601

Bridge and Approaches - SH 156
Infrastructure
Design
$2,000,000 CJ est. value
Ponca City, OK 74601

RFQ Construction Manager at Risk (CMAR) - Construction Manager At Risk (CMAR) Tonkawa Tribal Cultural Center
New Construction, Infrastructure - 12,100 SF
Bidding
$1,000,000 CJ est. value
Tonkawa, OK 74653

RFQ Construction Manager at Risk (CMAR) - Construction Manager At Risk (CMAR) Tonkawa Tribal Cultural Center
New Construction, Infrastructure - 12,100 SF
Bidding
$1,000,000 CJ est. value
Tonkawa, OK 74653

Tonkawa Street Improvements to Various Streets
Infrastructure
Post-Bid
$370,000 est. value
Tonkawa, OK

Drainage Improvements Project Joe Street, Phases 1 and 2
Infrastructure
Post-Bid
$300,000 CJ est. value
Ponca City, OK 74601

6th Street – Fresno Ave to Hartford Ave
Infrastructure
Results
Ponca City, OK

Road Construction OTOE Missouria
New Construction
Results
$1,000,000 to $5,000,000 est. value
Ponca City, Red Rock, OK 74651

Utilities - US 60
Infrastructure
Design
$1,000,000 CJ est. value
Ponca City, OK 74601

Kaw Nation Cemetery Paving Improvements
Infrastructure
Bidding
$3,000,000 CJ est. value
Ponca City, OK 74601

RFQ Design - Development of Airport Project - Blackwell-Tonkawa Municipal Airport
Demolition, New Construction, Infrastructure
Post-Bid
$2,600,000 CJ est. value
Blackwell, OK 74631

6 Months Sidewalk Maintenance
Term Contract
Results
Ponca City, OK

Bridge Rehabilitation - US 60
Infrastructure
Design
$3,759,812 CJ est. value
Ponca City, OK 74601

Kaw City NODA REAP Waterline to Water Treatment Plant
Infrastructure
Bidding
$79,800 CJ est. value
Kaw City, OK 74641

Last Updated 12/12/2022 07:40 AM
Project Title

Pedestrian Improvements (Sidewalks) - US-177

Physical Address View project details and contacts
City, State (County) Blackwell, OK 74631   (Kay County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,947,716 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Pedestrian Improvements (Sidewalks) Us-177: From 2.0 Miles South of the Sh-11 Junction, Extend North in the Town of Blackwell. Project Length = 2.05 Miles Counties: Kay Calendar Days: 180 Submit Any Questions or Concerns to the Office Engineer Division via: - Email: Odot-prebid.question@odot.org - Phone: (405) 521 - 2625 Each Bid Shall Be Accompanied by a Certified or Cashier's Check or Bid Bond Equal to 5% of the Bid Made Payable to the State of Oklahoma, Department of Transportation, as a Proposal Guaranty. Proposal Checks Will Be Held or Returned by the Department as Per Subsection 103.04 of the State Standard Specifications. ODOT- Call Order 435 - Pedestrian Improvements (Sidewalks) - US-177

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents