Similar Projects
Bayfront Street Scape and Parking Improvements
Bidding
Daphne, AL 36526

Raw Water Main K-6 Well 5 to Larry Street Road WTF 4
Infrastructure
Bidding
Daphne, AL

Multi-Use Recreational Trail Expansion along SR-1 (US-431)
Post-Bid
$1,000,000 to $2,000,000 est. value
Guntersville, AL 35976

Whistler Street Sidewalk Improvements
Post-Bid
$158,650 to $193,895 est. value
Prichard, AL 36610

24" Raw Water Line
Results
Less than $1,709,019 est. value
Bessemer, AL 35006

Phenix City Riverwalk
Results
Phenix City, AL

Brookwood Parkway Water Main
Infrastructure
Construction
Vance, AL 35490

Moniac Sidewalk and Tullis Manor Driveways
Alteration
Construction
Atmore, AL 36502

Son's Ford Parking Lot
Infrastructure
Pending Verification
Auburn, AL

Bob Williams Subdivision
Infrastructure
Pending Verification
Mobile, AL

2020 PS03 Pump Station Upgrades
Renovation, Infrastructure
Bidding
$3,500,000 est. value
Birmingham, Brighton, AL 35203

Agriculture Waterline Extension
Post-Bid
Hamilton, AL

Mountain View Drive Sidewalk Improvements
Results
Less than $370,000 est. value
Hoover, AL 35216

Water Main Relocation
Infrastructure
Construction
Northport, AL

Office Gravel Parking Lot
Infrastructure
Pending Verification
AL 36303

Reported 02/25/2022 12:00 AM
Project Title

Quad Residence Halls and Quad Drive - Infrastructure and Accessibility Improvements

Physical Address View project details and contacts
City, State (County) Auburn, AL   (Lee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes but is not limited to: Provide new hot and chilled water supply and return piping in Quad Drive to stub out for new service connections to Teague Hall, Little Hall, and a new student housing project to be constructed at a later date. Hydronic piping work includes connection to mains in Mell Street, valve installation, concrete anchors, expansion loops, new piping west along Quad Drive, and stub outs for future connection in the existing parking lot west of the Quad Center. Surface improvements will include all pavement trenching and patching necessary to facilitate the installation of new hydronic piping. Construction fencing for site security and general traffic control measures will be required for work on an active campus and coordination with the owner`s adjacent active projects.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents