Similar Projects
East Selmon Expressway Slip Ramps Design-Build
Design
Tampa, FL

Asphalt and Sidewalk Rehabilitation
Infrastructure
Bidding

Idlewild Ave And Sr 685 (n Florida Ave) - Traffic Signals/Pedestrian Safety Improvement
Infrastructure
Bidding
$955,700 est. value
FL

City Parking Lot Projects
Post-Bid
Plant City, FL 33563

Continuing Contract for Miscellaneous Concrete Flat Work
Term Contract
Post-Bid
Temple Terrace, FL

I-75 MLK DDI
Results
FL

Mirabay Pavement Rehabilitation Project
Results
Apollo Beach, FL 33572

Rivercrest Park Boardwalk Replacement Design-Build
Infrastructure
Bidding
$1,089,000 est. value
Tampa, FL 33603

Tribal Wide Parking Lot(s) Asphalt Patching, Sealing and Striping Services
Term Contract, Alteration
Post-Bid
Clewiston, Hollywood, Immokalee, Okeechobee, Tampa, FL 33610

Bike Path/Trail and Bike Lane/Sidewalk/Milling and Resurfacing/Drainage Improvements
Results
Less than $4,566,300 est. value
Temple Terrace, FL 33617

Tampa Police Department Impound Lot Relocation Design-Build
Alteration
Bidding
Tampa, FL 33603

Citywide Sidewalk Maintenance and Restoration Sheltered Market
Results
$250,000 est. value
Tampa, FL 33602

County-Wide Sidewalk Repair Services
Results
Less than $6,000,000 est. value
FL

Construction, Bruce B. Downs Boulevard Intersections and Sidewalk Improvements
Results
$3,776,048 est. value
Tampa, FL 33608

South Coast Greenway Trail, Phase 1A - Shell Point (LAP)
Results
$2,249,150 est. value
Ruskin, FL 33570

Reported 02/11/2022 12:00 AM
Project Title

Design-Build - Lee Roy Selmon Greenway Enhancements from Florida Avenue to west of South Jefferson Street

Physical Address View project details and contacts
City, State (County) Tampa, FL 33646   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $2,000,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Selmon Greenway is an existing active use, shared use path facility approximately 1.7 miles in length providing a connector for pedestrians and bike traffic to downtown Tampa locations and activities. The Selmon Greenway extends from the Hillsborough River at the Riverwalk to just east of 19th Street within a larger, city-wide trails network that includes the Riverwalk, Bayshore Boulevard Linear Park Trail, and the McKay Bay Trail. The purpose of this Design-Build Project is to reconstruct and enhance portions of the trail, upgrade the signage, lighting, seating and landscape plantings. The design shall include, but not be limited to, survey, geotechnical investigation, landscape design, electrical and lighting design, site plan design for grading, paving, and drainage; utility adjustments, signing and pavement marking, and demolition. The Design-Build Firm shall be responsible for, design, and preparation of all documentation related to the acquisition of all permits, maintenance of traffic, demolition, and construction on or before the Project completion date indicated in the Proposal. The DesignBuild Firm shall coordinate all utility relocations. All improvements shall utilize sustainable, recycled, and environmentally friendly products.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents