Similar Projects
East Miller Road Expansion - City of Republic
Infrastructure
Conception
Less than $1,000,000 est. value
Republic, MO 65738

Rehabilitation General Aviation Apron - Phase 1 - 413020 - City of St.Joseph
Infrastructure
Conception
$5,000,000 est. value
Saint Joseph, MO 64504

Project Sway Industrial Building
New Construction, Infrastructure
Design
$1,500,000 CJ est. value
Sedalia, MO 65301

Parking Lot Accessibility Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Maryville, MO 64468

Parking Lot Accessibility Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Maryville, MO 64468

O Fallon Firing Range Bullet and Lead Removal
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Cottleville, MO 63366

Demolition of the Old City Hall Buildings
Demolition, Infrastructure
Sub-Bidding
$139,000 CJ est. value
Peculiar, MO 64078

2021 Road Improvements
Post-Bid
Indian Point, MO

Asphalt Repair and Sealing
Infrastructure
Post-Bid
MO

Repave Streetscape at Justice Center
Results
Ballwin, MO 63011

2021 - Subdivision Asphalt Overlay
Results
$146,500 est. value
MO

South County Dodge Chrysler Jeep Ram Carwash
New Construction, Infrastructure
Pending Verification
$1,200,000 CJ est. value
Saint Louis, MO 63125

Tnemec Co. Inc Production and Warehouse
Addition, Demolition, Infrastructure - 310,700 SF
Pending Verification
$33,000,000 CJ est. value
North Kansas City, MO 64116

Reseal Joint and Marking of Taxiway Charlie and East Apron - 71132172 - City of Lees Summit
Infrastructure
Conception
$396,000 CJ est. value
Lees Summit, MO 64064

Resurface
Infrastructure
Bidding
$2,500,000 CJ est. value
St Peters, MO 63304

Last Updated 08/08/2022 08:36 AM
Project Title

Pavement Resurfacing

Physical Address View project details and contacts
City, State (County) Milan, MO 63556   (Sullivan County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $17,882,086 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job JNW0094 Route Various LINN, PUTNAM, SULLIVAN County. Pavement resurfacing at various locations in the Northwest District, the total length of improvement being 111.9 miles. Range: $10M to $15M Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. MODOT - A05 - Pavement Resurfacing *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents