Similar Projects
Riverlands Flow Trail Construction
Infrastructure
Bidding
$75,000 est. value
Sturbridge, MA 01518

Parking Lot and ADA Access
Post-Bid
Sutton, MA

Bituminous Concrete Sidewalks and Cement Concrete Pedestrian Ramps
Post-Bid
$100,000 to $125,000 est. value
Winchendon, MA 01475

Construction of the Twin Cities Rail Trail including Signals and 2 Bridges (Phase 1)
Results
Less than $6,865,000 est. value
Fitchburg, Leominster, MA 01453

Scheduled and Emergency Sidewalk and ADA Improvements and Related Work at Various Locations (Including Marthas Vineyard)
Results
Less than $670,000 est. value

Installation of ADA Compliant Crosswalks, Installation of Sidewalk and Walkway
Post-Bid
Less than $30,000 est. value
Holden, MA 01520

Pedestrian and Bicycle Improvements at Various Locations
Results
Less than $1,435,682 est. value

Snow Removal
Post-Bid
Westborough, MA

Pedestrian and Bicycle Improvements at Various Locations
Results
Less than $1,914,900 est. value

Draper Revitalization Brick Walkways /Seating Areas/ Monument Areas
Post-Bid
Milford, MA 01757

Pedestrian and Bicycle Improvements at Various Locations
Results
Less than $2,395,000 est. value

Southborough History Walk Pedestrian Improvements
Post-Bid
$380,000 est. value
Southborough, MA 01772

Pedestrian and Bicycle Improvements at Various Locations
Results
Less than $1,914,980 est. value

Town Center Improvements Project
Post-Bid
$900,000 est. value
West Brookfield, MA

Sidewalk and ADA Improvements and Related Work (including Signals) at Various Locations
Results
Less than $1,155,418 est. value

Reported 12/10/2021 12:00 AM
Project Title

Complete Streets Sidewalk Project East Main Street (Route 12)

Physical Address View project details and contacts
City, State (County) Webster, MA 01570   (Worcester County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $341,594
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this contract includes, but is not limited to, sidewalk improvements along approximately 1/5 - mile of East Main Street (Route 12), Slater Street, and Park Avenue in Webster, Massachusetts. Detailed work includes cement concrete sidewalk construction, sidewalk reconstruction, driveway reconstruction, drainage structure and pipe installation, crosswalk restriping, curb installation, lane markings, driveway construction, ADA/AAB-compliant pedestrian curb ramps, traffic signs and other incidental work. This project includes two bid add alternates. The work under Add Alternate Number 1 includes the sidewalk and pedestrian curb ramp improvements along the south side of East Main Street (Route 12) from Grandview Avenue to Hillside Avenue. Add Alternate Number 1 is approximately 275’ in length. The work under Add Alternate Number 2 includes the sidewalk and pedestrian curb ramp improvements along the south side of East Main Street (Route 12) from Hillside Avenue to Paradis Lane. Add Alternate Number 2 is approximately 300’ in length and includes minor drainage improvements.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents