Similar Projects
500,000 Gallon North Water Tower
Infrastructure
Bidding
River Falls, WI

Bldg. 203 W5 Tank Replacement
Addition
Post-Bid
Milwaukee, WI 53207

High-Vacuum Chamber Modification
Post-Bid
Madison, WI

Softener System Modifications
Results
Less than $180,000 est. value
Madison, WI

Elevated Spheroid Repainting and Repairs
Results
$389,500 est. value
WI

Tower Site Construction
Infrastructure
Post-Bid
WI

Washburn Water Tower Painting and Mixing
Results
Oshkosh, WI 54904

Interior Wet, Dry Interior and Exterior Painting, and Modifications of 300,000 Gallon Water Tower
Infrastructure
Post-Bid
Cornell, WI

Elevated Tank Repaint
Term Contract
Results
Brookfield, WI

Lincoln Avenue 1.0 Mg Composite Water Tower Rehabilitation
Renovation
Results
Plover, WI

Frank H Elevated Tank Repainting
Results
Waunakee, WI

Dilution and Mixing Tanks 1 and 2 Rehabilitation
Results
Milwaukee, WI

Water Tower Rehabilitation
Results
WI

Acid Crock Treatment
Results
Milwaukee, WI 53204

2021 Elevated Storage Tank Recoating
Alteration
Results
$450,000 est. value
Kiel, WI

Reported 04/01/2022 12:00 AM
Project Title

Lac du Flambeau 250K Steel Elevated Water Tower Improvements

Physical Address View project details and contacts
City, State (County) Lac du Flambeau, WI   (Vilas County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Complete existing coating removal and application of new coating system on wet interior, spot removal/repair of the existing dry interior coating system (~25% of surface area), complete exterior power wash, exterior spot repair, complete application of new over-coating system on the exterior. Miscellaneous improvements to the water tower. Alternate Work: Replace existing expansion joint, construct interior dry paneled enclosure building, install 10" gate valve w/box.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents