Similar Projects
2021 Subaqueous Water Main Crossing - Shinnecock Canal at Meschutt Beach and Ponquogue Bridge at Lighthouse Road
Infrastructure
Bidding
Hampton Bays, NY 11946

East Beach Bluff Stabilization
Infrastructure
Bidding
Port Jefferson, NY 11777

Shore Road Waterfront Park Natural Systems Resiliency Improvements
Post-Bid
Lindenhurst, NY 11757

Corrugated Polyethylene Drainage Pipe
Infrastructure
Post-Bid
Brookhaven, NY

Governor`s Office of Storm Recovery Mastic Beach Drainage Improvements CR12 General Construction
Results
$2,025,000 to $2,406,000 est. value
Farmingville, NY 11738

Cured-In-Place Pipelining - Term Construction Contract 7
Results

Fire Island to Montauk POint (FIMP) - Sandy Program
Term Contract
Bidding
Fire Island, Montauk, NY 11954

Annual Drainage Contract A, B and C
Term Contract
Post-Bid
East Hampton, NY

Drainage Improvements Albany Avenue Resurfacing
Infrastructure
Results
Lindenhurst, NY 11757

Stable Area Drainage Improvements
Infrastructure
Bidding
$99,450 to $134,550 est. value
Huntington, Lloyd Harbor, NY 11743

Cast Iron Drainage Items
Term Contract, Infrastructure
Post-Bid
Smithtown, NY

Lakeside Drive Roadway and Slope Stabilization
Infrastructure
Results
Huntington, NY 11721

Precast Storm Drainage Structures and Reinforced Concrete Pipe
Term Contract
Post-Bid
Huntington, NY

2.0 Million Gallon Reservoir
Infrastructure
Results
East Hampton, Sag Harbor, NY 11963

West Neck Farm Seawall Restoration
Infrastructure
Results
NY

Last Updated 11/18/2021 03:10 PM
Project Title

Reconstruction of Bulkhead at Marine Museum- Phase I

Physical Address View project details and contacts
City, State (County) Yaphank, NY   (Suffolk County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents