Similar Projects
US 93/Interstate 40 - West Kingman Traffic Interchange - Phase 2 - Arizona Department of Transportation (AZDOT)
Alteration
Conception
$41,000,000 est. value
Kingman, AZ 86401

Ocotillo Road - Greenfield to Higley - ST0540 - City of Gilbert
Infrastructure
Conception
$54,408,000 est. value
Gilbert, AZ 85298

FSR 26 Surfacing & Stabilization A-S NF
Infrastructure
Design
$1,000,000 est. value
Springerville, AZ 85938

Tucson - Benson Highway (I-10) (Ajo Way to MP 272)
Infrastructure
Bidding
$27,461,166 est. value
Tucson, AZ 85706

Destination at Gateway (Berge) Offsite Paving and Waterline Williams Field Road
Infrastructure
Bidding
$1,300,000 to $1,500,000 est. value
Mesa, AZ 85212

Supply or Supply and Deliver Hot Asphaltic Concrete
Post-Bid
Prescott, AZ

Groundhog Vista Landowners Roadwork
Post-Bid
Tucson, AZ 85743

Construct New Roadway
Results
Less than $130,000,000 est. value

Construct New Roadway
Results
Less than $130,000,000 est. value

1st Avenue - Phases 2 - 4 (CP0929) - City of Mesa
Infrastructure
Conception
Mesa, AZ 85201

Why-Tucson Highway (SR 86) (Tribal Route 232 - Sells Mp 10)
Infrastructure
Bidding
$2,300,000 est. value
Sells, AZ 85634

Annual Road Maintenance Contract
Infrastructure
Post-Bid
Holbrook, AZ

Construction Administration TT0342, McKellips Road SR 101 to Alma School Road
Results
Phoenix, AZ 85009

Baseline Road - Greenfield To Power (Gilbert For St0780) - Cp1096 - City Of Mesa
Alteration
Conception
$2,781,329 est. value
Mesa, AZ 85206

National Forest System Road (NFSR) 700 and 91 Road Surfacing
Infrastructure
Bidding
$500,000 to $1,000,000 est. value
Flagstaff, AZ

Reported 07/12/2022 12:00 AM
Project Title

Type 3 Slurry Seal and Open Grade Slurry Seal

Physical Address View project details and contacts
City, State (County) Parker, AZ   (La Paz County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Use of the ADOT Asphalt index for pricing, Oil, Labor, Tax and any other needs for a TYPE 3 Slurry (minimum 20 pounds per square yard) and for an OPEN GRADE Slurry (minimum 50 pounds per square yard).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents