Similar Projects
Century High School Swimming Pool and Locker Room Addition BP 2
Addition, Alteration
Results
$2,500,000 est. value
Rochester, MN 55906

Flandrau Pool Pump 3
Alteration
Post-Bid
New Ulm, MN 56073

Century High School Swimming Pool and Locker Room Addition BP 1
Addition, Alteration - 25,863 SF
Results
$2,500,000 est. value
Rochester, MN 55906

SCSU Halenbeck Hall Pool Improvements
Renovation
Results
Saint Cloud, MN 56301

Jordan Park Pool
Alteration
Conception
$1,500,000 est. value
Minneapolis, MN 55411

Municipal Pool Gutter Replacement
Results
$400,000 to $450,000 est. value
Caledonia, MN 55901

Century Middle School Pool Addition - Bid Package 5 - Endless Pool Design Build
Infrastructure
Results
Lakeville, MN 55044

Luverne Area Aquatics & Fitness Center
New Construction
Post-Bid
$4,300,000 est. value
Luverne, MN

Rolling Hills South Development
New Construction, Infrastructure
Pending Verification
Chaska, MN 55318

Worthington Aquatic Center Project
Alteration
Results
Worthington, MN

Last Updated 10/07/2021 09:07 AM
Project Title

SMSU-20-PE Pool Deck Replacement

Physical Address View project details and contacts
City, State (County) Marshall, MN 56258   (Lyon County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consist of complete removal of existing pool deck surface and embedded piping. Removal of existing deck drains and associated piping. Replacement of existing main drain in diving well and associated piping. Repair of vertical crack in diving well. Installation of new resinous flooring system. Retrofit of existing perimeter gutter system and replacement of existing ceramic tile finish in pool tanks with plaster finish Location: 1501 State St Marshall, MN 56258 Physical Education (PE) Building located on north side of campus, kitty corner to Schwans Regional Event Center (football stadium).

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents