Similar Projects
East Graves Avenue Sidewalks from Orange Avenue to Trafford Avenue
Infrastructure
Bidding
$48,000 est. value
Orange City, FL 32763

Daytona Campus - Parking Lots A, B and C
Post-Bid
Daytona Beach, FL 32114

West Beresford Avenue ADA Sidewalk
Infrastructure
Post-Bid
$203,000 est. value
Deland, FL 32720

Derbyshire Neighborhood Sidewalks Phase 1 - Third Street and Vine Street
Results
$589,000 to $763,000 est. value
Daytona Beach, FL 32100

Jefferson Street Parking Lot
Results
New Smyrna Beach, FL 32168

Beresford Avenue Sidewalk
Results
Less than $520,000 est. value
FL

Florence Street On-Street Parking Improvements
Results
Less than $61,780 est. value
Ormond Beach, FL 32173

Down Under Shared Parking Area Repair and Environmental Enhancement
Results
Less than $18,500 est. value
Port Orange, FL 32129

Parking Lot Paving
Results
Deland, FL

Driveway Replacement
Results
Ormond Beach, FL 32174

Beville Road Multi Use Path - Lap
Infrastructure
Results
Daytona Beach, FL 32116

As Needed New Sidewalk Installation and Repairs
Term Contract
Results
Deltona, FL

Duss Street Streetscape Project
Infrastructure
Results
$100,000 est. value
New Smyrna Beach, FL 32168

Cherrywood Drive and Division Avenue Sidewalk Repair
Infrastructure
Results
Ormond Beach, FL 32174

Daytona Beach Courthouse Annex Ramp Renovation
Infrastructure
Results
$175,000 est. value
Daytona Beach, FL 32114

Last Updated 03/16/2022 08:20 AM
Project Title

New Smyrna Beach Middle New Parent Loop and Parking

Physical Address View project details and contacts
City, State (County) New Smyrna Beach, FL 32168   (Volusia County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Site work including required grading. 2. Resurfacing of existing driveway pavement. 3. Construction of the new high jump, shot put and discus throw facilities. 4. Construction of soaker swale and drainage system. 5. Restore disturbed areas to pre-construction or better condition. 6. Driveway striping and signing. 7. Sod, grass and mulch designated areas.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents