Similar Projects
Ocean County College Administration Building
New Construction
Design
Toms River, NJ

PTS Farminary
New Construction
Design
Princeton, NJ 08540

Wilson Hall Dance Program Expansion Addition
Addition - 7,625 SF
Bidding
Glassboro, NJ 08028

Mcguire Campus Renovations for the Culinary Arts Program
Renovation
Bidding
Newton, NJ 07860

Camden Dining Hall Teaching Kitchen
Renovation
Bidding by Invitation
Camden, NJ 08102

Construction of Essex County College Bathroom Upgrades
Post-Bid
Newark, NJ 07102

Brantl Lecture Hall Renovation
Renovation
Post-Bid
Little Falls, NJ 07424

Construction of the New Student Welcome Center
New Construction
Results
Newark, NJ 07102

Elevator Maintenance
Results
Edison, NJ 08818

STEM Phase III-Armstrong Renovation Project
Renovation - 26,360 SF
Construction
Ewing, NJ 08626

Student Center Ballroom Refurbishment
Construction
Glassboro, NJ 08028

Princeton University FitzRandolph Observatory Demolition
Demolition - 5,278 SF
Design
Princeton, NJ 08544

Townsend Residential Life Center Renovations
Renovation - 1,587 SF
Bidding
Galloway, NJ 08205

Blanton Hall Occupational Health Renovation
Renovation
Post-Bid
Little Falls, NJ 07424

F-Wing Main Campus Building 100 Level Renovations Project
Renovation
Results
Galloway, NJ 08205

Last Updated 12/10/2020 11:17 AM
Project Title

Interior Renovations for Kean University at Gateway Building 101

Physical Address View project details and contacts
City, State (County) Toms River, NJ 08754   (Ocean County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes, but is not limited to, the following items. Interior wall and ceiling demolition New gypsum wall construction New door installation New acoustic and gypsum ceiling construction Cleaning and painting of existing ceiling grid; replacement of existing ceiling tiles Replacement of existing carpeting with carpet tiles and vinyl composite tile New millwork installation HVAC diffuser and grill replacement; air balancing of all spaces; cleaning of VAV coils New electrical receptacles Replacement of existing lighting with new lighting Installation of new data cabling and reuse of existing data cabling. All new data cabling must be terminated on an existing patch panel by this contractor. Plumbing at new break room and existing 3rd floor break room Security cage construction Modifications of existing fire alarm system The College and building will be in use during the entirety of this project. Safety precautions must be used to ensure the safety of the faculty, staff, students and the public at all times, including the installation of barriers and temporary walls, where necessary. Storage containers and dumpsters will be allowed in the parking lot at the rear, lower level of the building on a limited basis and the location must be approved by the College. Please review construction documents for the complete scope of work and work requirements

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents