Similar Projects
Bolton High School Chiller Replacement
Alteration
Bidding
$200,000 est. value
Alexandria, LA 71301

Provide and Install New PVI Hot Water Heater
Infrastructure, Alteration
Bidding
$200,000 est. value
New Orleans, LA 70126

Plumbing And Mechanical Services
Alteration
Post-Bid
Shreveport, LA 71115

Mechanical and Electrical Repairs to the Louisiana Black History Hall of Fame at the Lincoln Theater
Alteration
Post-Bid
Baton Rouge, LA 70802

Main Branch Library Boiler Replacement
Alteration
Results
$325,000 est. value
Baton Rouge, LA 70806

Hurricane Laura (Dr-4559-La) Disaster Recovery Program Water Treatment Plants – Chemical Feed System Repairs
New Construction, Alteration
Results
$450,000 est. value
Lake Charles, LA 70601

Water Fountain Replacement
Alteration
Bidding
$200,000 est. value
Lafayette, LA

Jourdan Road Terminal Cold Storage Expansion Refrigeration System Installation
Renovation, Alteration
Post-Bid
New Orleans, LA 70126

Monitoring and Maintaining Lapalco Decorative Fountain Systems
Term Contract
Results
Gretna, LA

St. James Parish Hospital Chiller Addition
Alteration
Bidding
$60,000 est. value
Lutcher, LA 70071

Airport Boiler Repair - Pot Feeder
Alteration
Post-Bid
New Orleans, LA

Restoration of Hurricane Damage to the Cafeteria/Band Building at Gueydan High School
Renovation, Infrastructure, Alteration
Results
LA

Water Fountain Replacement at South Louisiana Community College
Alteration
Bidding
$170,000 est. value
Lafayette, LA 70506

Airport - Temporary Boiler
Alteration
Post-Bid
Kenner, LA

Siemens Apogee Building Automated Systems And Mechanical Systems
Term Contract, Infrastructure
Results
Gretna, LA

Last Updated 06/08/2022 03:36 AM
Project Title

Brown Hall Gym Chiller Lines

Physical Address View project details and contacts
City, State (County) Monroe, LA   (Ouachita County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $530,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide labor and materials required to repair chiller lines on the roof of Brown Hall Gym and Brown Hall Annex. Tasks include: Contractor to remove old metal covering, insulation, pipe, and dispose of it in a waste container. All new pipe shall be no less than 4 inches off of the roof with Insulation and metal covering. Contractor to perform a pressure test on all new pipe and including the air handlers for 24 hours. Contractor may use compressed air to perform the test. Contractor will work with ULM for the drain valves placement in the system. Contractor will install all pipe, supports, insulation, valves, to meet all codes Materials to be included: 307.00 LF - R&R Water supply line type L - copper fitting & hanger, 2-1/2", 68.00 LF - R&R Water supply line type L - copper with fitting and hanger, 2", 386.00 LF - R&R Water supply line type L - copper fitting & hanger, 1-1/2", 761.00 LF - R&R Fiberglass pipe insulation - 1" wall for 1 1/2" to 2" pipe 4.10 761.00 LF - Material Only Flashing, 14" wide. Aluminum material used for metal jacket around piping and insulation. R&R Ball valve - brass - 3/4". (2) Bleeder valves at high point at top of wall. (6) valves at drain lines on roof next to drains. (12) shut-off valves at high point into each unit atop roof 4.12 R&R Condensate drain line - drains at low points. Connect hose for draining. Rooftop pipe supports 4.14 4" pipe straps for risers on wall, top, middle and bottom.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Packaged Water Chillers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents