Similar Projects
Mt Bighorn Warman Loop Road
Term Contract
Design
MT

Y--GAOA - EMDD Fog Seal
Term Contract
Design
$100,000 to $250,000 est. value
Billings, MT 59101

Rehabilitate Final 9.3 Miles of the Going-To-The-Sun Road and Replace Bridge Over Mcdonald Creek
Renovation, Term Contract
Bidding
West Glacier, MT 59936

Grading, Gravel, PMS Surfacing, Drainage, Rumble Strips, Fencing and Pavement Markings on the SF 169 Fairfield Curve Improvements
Infrastructure
Bidding
MT

Asrwss Fort Peck West Branchlines Project; Phase 2, Phase 3 And Phase 4
Alteration
Post-Bid
Poplar, MT 59255

Mercury Street Improvements Project
Infrastructure
Post-Bid
Butte, MT 59701

Headwaters Trail System Jefferson Street Connection - 2021
Infrastructure
Results
Three Forks, MT 59752

Silver Bow Creek Greenway Cattle Bridge - Greenway Service District
New Construction, Infrastructure, Alteration
Results
Ramsay, MT

Y--GAOA Stellar Creek Road Repair
Term Contract
Design
$500,000 to $1,000,000 est. value
Forsyth, MT 59327

Overlay and Chip Seal SE of Fort Peck SE Wolf Point Area
Infrastructure
Bidding
Fort Peck, MT

Pistol Range, Parking & Road Improvements
Alteration
Post-Bid
Billings, MT

2021 Water System Improvements
Infrastructure, Alteration
Results
$4,051,000 est. value
Bigfork, MT 59911

Scrub Seal Fog Seal East of Brady East Great Falls Area
Infrastructure
Bidding
Great Falls, MT

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

2011-00141 BIA Route #0073 Improvements - Phase III
Infrastructure
Results
MT

Reported 12/08/2021 12:00 AM
Project Title

Removal and Replacement of Road and Parking AC Pavement in Riverfront Park

Physical Address View project details and contacts
City, State (County) Billings, MT   (Yellowstone County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of: Schedule 1 - Milling and overlay of Poly Drive (17th St W to 13th St W) and 4th Ave N (N 27th St to N 13th St). Schedule 2 – Removal and replacement of road and parking AC pavement in Riverfront Park.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents