Similar Projects
North Central Region Waterway Marker Project
Infrastructure
Bidding

North Central Region Waterway Marker Project
Infrastructure
Bidding

Harvey E. Oyer Jr. Park Marina Boat Ramp Improvement Project
Post-Bid
$1,200,000 est. value
Boynton Beach, FL 33435

Martin County Bs/Mpz Marker Construction Project
Post-Bid
Jensen Beach, Stuart, FL

Jensen Beach Mooring Field Balls
Results
Less than $287,000 est. value
Stuart, FL 34996

Peanut Island - Boardwalk Repairs
Term Contract
Results
Less than $100,000 est. value
West Palm Beach, FL 33411

Dock Demolition at the Jupiter Inlet Lighthouse Outstanding Natural Area
Post-Bid
Jupiter, FL

John Prince Park - Boat Ramps Replacement
Term Contract
Results
Less than $770,000 est. value
Lake Worth, FL 33461

Robiner Park Pathway and Kayak Launch
Infrastructure
Post-Bid
$300,000 est. value
Royal Palm Beach, FL 33411

Dune Crossover Renovations, Phase IV
Results
Less than $925,000 est. value
Jupiter, FL

Corbett Boardwalk Phase 1
Results
Less than $501,000 est. value
West Palm Beach, FL 33412

Inshore Annual Construction (Federalized)
Results
Palm Beach Gardens, FL 33408

Ocean Inlet Park - Marina Replacement
Results
Lake Worth, FL 33460

Shepard Park Boating Parking Improvements
Results
$550,000 est. value
Stuart, FL

Lake Park Harbor Marina Piling Replacement
Results
Lake Park, FL 33403

Last Updated 10/11/2021 02:17 PM
Project Title

Y--BLM-ES-ONA Boardwalk Repairs

Physical Address View project details and contacts
City, State (County) Hobe Sound, Jupiter, FL 33469 (Martin, Palm Beach Counties)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor will provide all the technical expertise, materials, tools, equipment, and manpower required to repair the rotten section of boardwalk. The contractor shall deconstruct the necessary sections of the boardwalk, repair, replace or otherwise install new piling necessary to support he boardwalk, and reconstruction the boardwalk section to seamlessly fit with the existing boardwalk decking and handrails. This Statement of Work is not meant to be an allinclusive to do list for the project, but a list of the main items involved in the project.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents