Similar Projects
Orchards at Howard Gap
New Construction, Infrastructure
Conception
$9,000,000 CJ est. value
Hendersonville, NC 28792

Cedars Lodge and Spa
Demolition, New Construction, Infrastructure
Design
$60,091,960 CJ est. value
Hendersonville, NC 28791

Cedars Lodge and Spa
Demolition, New Construction, Infrastructure
Design
$60,091,960 CJ est. value
Hendersonville, NC 28791

EMS 6
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Fletcher, NC 28732

Ecusta Trail Greenway Project
Infrastructure
Bidding
$1,000,000 CJ est. value
Hendersonville, NC 28791

The Standard at Wilmont
New Construction, Infrastructure
Sub-Bidding
$115,000,000 CJ est. value
Hendersonville, NC 28792

The Standard at Wilmont
New Construction, Infrastructure
Sub-Bidding
$115,000,000 CJ est. value
Hendersonville, NC 28792

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Garrison Lane Site Improvements - Project Wheel
Infrastructure
Results
$575,285 est. value
Hendersonville, NC

Curb Ramps, Sidewalk, Pavement Marking, and Traffic Control
Infrastructure
Results

Ingles #140 / Fletcher
New Construction, Infrastructure - 88,988 SF
Pending Verification
$23,000,000 CJ est. value
Fletcher, NC 28732

Legacy Place Industrial/Manufacturing Flex Space
New Construction, Infrastructure
Pending Verification
$13,500,000 CJ est. value
Fletcher, NC 28732

The Stillwell
New Construction, Infrastructure - 65,000 SF
Design
$18,500,000 CJ est. value
Hendersonville, NC 28792

Fleetwood Plaza Water System Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Hendersonville, NC 28792

Last Updated 07/13/2023 01:06 PM
Project Title

Airport Road Sidewalk Construction

Physical Address View project details and contacts
City, State (County) Fletcher, NC 28732   (Henderson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of sidewalk, pedestrian signal crossings, wheelchair ramps, and drainage along NC 280 Airport Road from US 25 Hendersonville Road to the southernmost entrance to Walmart Deadline to Submit Questions 06/07/2023 at 3:00 PM ET.All questions concerning this Advertisement for Bids should be submitted via email to: Dustin Clemens, Project Manager dclemens@ashevillenc.gov Questions pertaining to the bid will be answered in the form of a written addenda posted to the City of Asheville's bid page. The City of Asheville reserves the right to reject any or all bids and to waive informalities.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents