Similar Projects
I-75 Reconstruction
Infrastructure
Bidding
MI

Corrugated Metal Pipe
Alteration
Bidding
Saint Clair, MI

Iron Belle Trail Bridge
Post-Bid
Petoskey, MI 49770

Quanicassee Road Grade, Base, Drainage
Post-Bid
Caro, MI 48723

Shoreline Protection Project on Us-23 in Presque Isle County Approximately 3 Miles North of Rogers City
Results
Rogers City, MI

Culvert Replacement, Scour Counter Measures and approach Reconstruction on M-26 over Quincy Creek
Results
MI

Concrete Patching and Drainage Structure Repairs
Infrastructure, Alteration
Bidding
Detroit, MI

Church Road Over Muskrat Creek
Post-Bid
Saint Johns, MI 48879

Korpela to Wakefield Stateline Grade Extension Culvert and Bridge Replacement
Results
MI

Corrugated Metal and Plastic Pipe
Infrastructure
Bidding
Lapeer, MI

Mont Ripley Slope Stabilization
Post-Bid
Less than $900,000 est. value
Hancock, MI

Public Safety Campus Expansion, Phase II
Results
Walled Lake, MI

Soil Erosion
Infrastructure
Bidding
Clinton Township, MI

Multiple Blocks - W and S - Storm Water Outlet Erosion Repair, SE Huron Parkway and Hubbard
Post-Bid
Ann Arbor, MI 48109

South Watervliet Drain #485
Results
Less than $2,440,000 est. value
Saint Joseph, MI

Last Updated 12/23/2021 11:27 PM
Project Title

2022 Reinforced Concrete Pipe

Physical Address View project details and contacts
City, State (County) Monroe, MI   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents