Similar Projects
Z--Mechanical, Electrical and Plumbing (MEP) Multiple Award Construction Contract
Design
$150,000 to $10,000,000 est. value

FA DAY Boiler Replacement and Related Equipment - General Bid
Bidding
Less than $738,000 est. value
Newton, MA 02460

Ball Hall Installation of Dampers
Bidding
Less than $65,000 est. value
Lowell, MA

Dual Media Replacement
Post-Bid
Lowell, MA

Replace Boiler 1 at Barracks 5230
Post-Bid
Less than $35,000 est. value
Hanscom A F B, MA

FMC Devens - Construct Freezer at Warehouse
Results
$100,000 to $250,000 est. value
Ayer, MA 01432

Replace Compactor Rail System at Bldg 1855
Results
Less than $25,000 est. value
Bedford, MA 01731

Ditson School Boiler Replacement
Bidding
Billerica, MA 01821

Hot Water Heater Jackets and Pipe Insulation
Post-Bid
$22,000 est. value
Acton, MA

Micro Bulk Liquid Argon Gas System
Results
North Chelmsford, MA

Rmove Wak-In Cooler B1425
Post-Bid
Less than $25,000 est. value
Bedford, MA 01731

Forge Village Water Treatment Plant Media Replacement
Results
Less than $250,000 est. value
Westford, MA 01886

Country School Boiler Section Replacement - Remove and Replace 12 Sections of a Burnham V11 Boiler
Post-Bid
Less than $23,000 est. value
Weston, MA 02493

Boiler Replacement at the Butters Row Water Treatment Plant
Results
$75,000 est. value
Wilmington, MA

Heating System/Boiler Repair and Refrigeration/HVAC Repair
Term Contract
Post-Bid
Less than $35,000 est. value
North Reading, MA

Last Updated 03/15/2019 09:39 AM
Project Title

Community Room & Meeting Room Mechanical System Replacement, Brady Towers AMP-2

Physical Address View project details and contacts
City, State (County) Somerville, MA 02143   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $90,200
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Community Room & Meeting Room mechanical system replacement. Replacement of existing hydronic unit ventilator units with two ducted fan coil units and two energy recovery ventilators and controls to serve the separate spaces. Project includes electrical work to facilitate demolition of existing equipment and power for new equipment and fire protection work to relocate sprinkler heads and piping to accommodate new mechanical equipment and ductwork within ceiling plenum.
Details
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents