Similar Projects
Maple Street Industrial Addition
Addition, Demolition, Renovation, Infrastructure - 58,600 SF
Conception
$5,000,000 CJ est. value
Bellingham, MA 02019

Holmes Street Multi Residential Development
Demolition, New Construction, Infrastructure
Design
$2,000,000 CJ est. value
North Quincy, MA 02171

Holmes Street Multi Residential Development
Demolition, New Construction, Infrastructure
Design
$2,000,000 CJ est. value
North Quincy, MA 02171

John D. Hardy Elementary School / Wellesley
Demolition, LEED Certification, New Construction, Infrastructure - 81,390 SF
Post-Bid
$57,300,000 CJ est. value
Wellesley, MA 02482

Excavation for Identification of Water Services
Post-Bid
$1,230,142 est. value
Boston, MA

CY2022 Crack Sealing
Infrastructure
Results
Dedham, MA

Repair of Bituminous Concrete Patches
Infrastructure
Results
$200,000 est. value
Brookline, MA

Gillette Stadium Renovation
Addition, Renovation, Infrastructure
Construction
$225,000,000 CJ est. value
Foxborough, MA 02035

Construct a New Approximately 21,700 Sf Fire Headquarters and Renovate 2,500 Sf of the Former Headquarters Building - GC
New Construction, Renovation, Infrastructure - 21,700 SF
Construction
$16,017,000 CJ est. value
Milton, MA 02186

Massapoag Street Residential Subdivision
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
S Weymouth, MA 02190

Citgo
Renovation, Addition - 1,786 SF
Pending Verification
Braintree, MA 02184

Bennett Lane Multi Residential Development
Demolition, New Construction, Infrastructure
Design
$19,000,000 CJ est. value
Quincy, MA 02169

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Roadway Trench Milling and Paving
Infrastructure
Results
$240,000 est. value
Needham, MA

RFQ Contractor - Proposed Bridge Replacement Westover Parkway Over Germany Brook
Infrastructure
Construction
$748,965 CJ est. value
Norwood, MA 02062

Last Updated 08/22/2023 03:18 PM
Project Title

MBTA Quincy Bus Maintenance Facility - GC

Physical Address View project details and contacts
City, State (County) Quincy, MA 02169   (Norfolk County)
Category(s) Commercial, Heavy and Highway, Sewer and Water, Transportation
Sub-Category(s) Gas Station, Misc. Structures, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Vehicle Sales/Service, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $400,000,000 [brand] Estimate
Plans Available from Agency's Affiliate - 04/07/23
Owner View project details and contacts
Architect View project details and contacts
Description

MBTA Quincy Bus Maintenance Facility, Quincy, MA (QBMF). QBMF includes but is not limited to the construction of a new, 300,000 square foot, 2-story, LEED Certified bus facility with BEB charging equipment (including but not limited to pantographs, chargers, and plug-in dispensers), charge management software (CMS), approximately 240 parking spaces, a new sidewalk along Burgin Parkway, an extension of Columbia Street to Burgin Parkway, a new signalized intersection, utility connection across Burgin Parkway to MBTA Quincy Adams Station communication room, a proposed electrical switching station, and two substations. General Bid Deadline 4/28/23 Time 12:00 P.M. Contractor Qualification DCAMM Certificate All questions should be submitted to R17CN06@mbta.com by April 19, 2023 As of June 21, 2023, CM at Risk has been selected. Subcontract trade RFQ, SOQ listed separately. Anticipated substantial completion is fall 2026.

Details

300,000 SF - 2 Stories Above Grade, 300,000 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents