Similar Projects
Pittsburgh Theological Seminary Phase 2 - 6 South Quad Green Space
New Construction
Conception
Pittsburgh, PA 15206

Forbes Avenue Gateway Park
New Construction
Conception
Pittsburgh, PA

Centre District - Pittsburgh Penguins Former Arena Site - Entertainment Facility by Live Nation and Parking Garage
New Construction - 40,000 SF
Design
$3,000,000 est. value
Pittsburgh, PA 15219

Southside Works - Tunnel Park Playground and Dog Park
New Construction - 2,320 SF
Design
$500,000 to $1,000,000 CJ est. value
Pittsburgh, PA 15207

Devlin Park Tennis Court Reconstruction
Renovation
Bidding
Wexford, PA 15090

Settlers Cabin Park Pinkertons Run Amd and Stream Improvements Project
Renovation, Infrastructure
Bidding
Pittsburgh, PA 15205

Installation of Sof Surfaces
Term Contract
Post-Bid
Pittsburgh, PA

Ballfield Mixture
Post-Bid
Carnegie, PA

Avalon Community Park Improvements - Phase I
Results
Less than $77,400 est. value
Pittsburgh, PA 15202

South Park Cascades Restoration
Results
South Park Township, PA 15129

Hazelwood Green Plaza
New Construction - 86,196 SF
Construction
$4,975,000 est. value
Pittsburgh, PA 15207

Kaufmann's Grand on Fifth - Rooftop Ice Skating Rink
New Construction
Construction
$50,000 est. value
Pittsburgh, PA

Allegheny Landing Park
Renovation
Conception
Pittsburgh, PA 15212

August Wilson House Site Development
Renovation
Design
Pittsburgh, PA 15219

Prospect Park Phase I
New Construction
Post-Bid
Pittsburgh, PA 15207

Last Updated 03/17/2022 08:40 AM
Project Title

McKinley Park Chicken Hill Green Infrastructure Project

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15123   (Allegheny County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work will consists of select demolition, resetting of brick paving (with concrete base) and stone curb, concrete curbs, excavation for subsurface storm water storage, subsurface storm water storage, new catch basins, modifying existing catch basins, storm pipe trenching and installation, concrete retaining walls, 8 foot and 5 foot wide compacted aggregate trails, landscape restoration, and planting as required or directed. Green infrastructure flow from catch basins will be directed into green infrastructure features within the park. Overflow pipe from the catch basin will be connected back to PWSA's combined sewer.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents