Similar Projects
Architectural and Engineering Services- BIA
Infrastructure
Conception
Bangor, ME 04401

Cascade Park Renovation - City of Bangor
Renovation, Infrastructure
Conception
$260,000 CJ est. value
Bangor, ME 04401

Eastside Center for Health and Rehabilitation Entrance
Addition, Infrastructure
Design
$500,000 CJ est. value
Bangor, ME 04401

Eastside Center for Health and Rehabilitation Entrance
Addition, Infrastructure
Design
$500,000 CJ est. value
Bangor, ME 04401

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP Construction Manager - Llewellyn Estes Bridge #1 and #2 - Old Town - Region 4
Demolition, New Construction, Infrastructure
Post-Bid
$39,189,000 CJ est. value
Old Town, ME 04468

Pavement Milling, Hot Mix Asphalt Overlay, Ultra - Thin Bonded Wearing Course with Drainage and Safety Improvements
Results
Less than $4,403,000 est. value
Medway, ME

Statewide Geotechnical Drilling
Infrastructure
Results

Large Culvert Replacement - Patten - Region 5
Infrastructure
Construction
$484,482 CJ est. value
Patten, ME 04765

Large Culvert Replacement - Patten - Region 5
Infrastructure
Construction
$484,482 CJ est. value
Patten, ME 04765

The Rock Church of Greater Bangor Expansion
Addition, Infrastructure - 2,100 SF
Pending Verification
$3,000,000 CJ est. value
Bangor, ME 04401

Davis Residential Subdivision
New Construction, Infrastructure
Pending Verification
$3,130,432 CJ est. value
Bangor, ME 04401

Mansfield Stadium LED Light Replacement - City of Bangor
Infrastructure
Conception
$400,000 CJ est. value
Bangor, ME 04401

Hammond Street Mixed Use Development
New Construction, Infrastructure - 12,000 SF
Design
$1,000,000 CJ est. value
Bangor, ME 04401

Construction of a Sand/Salt Storage Building
Demolition, New Construction, Infrastructure
Post-Bid
$625,000 CJ est. value
Holden, ME 04429

Last Updated 10/17/2023 07:08 PM
Project Title

State Street/ Forest Ave Intersections Improvements Project

Physical Address View project details and contacts
City, State (County) Bangor, ME 04401   (Penobscot County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $99,976 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Bangor requests bids for removal of existing traffic signals, wood poles and equipment, and the construction of new sidewalk bump-outs with new ADA crosswalks and RRFB's at the intersection of State Street and Forest Avenue. The project will include a catch basin install, some granite curb replacement, sidewalk pavement, along with other incidental work. Questions regarding any of the above items may be referred to Ted Trembley, City of Bangor Engineering Dept., at 207-992-4251 or e-mail ted.trembley@bangormaine.gov. The work contemplated under the terms of this contract consists of the following general items of work: o Remove existing signal equipment and wood poles.. o Install new catch basin as shown on plans. o Replace and or reset portions of granite curbing as shown on plans. o Construct new sidewalk and install new detectable warning fields (ramps) as shown on the plans. o Install new RRFB's as shown on plans

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents