Similar Projects
Construction Community Centers Remodels at 4 Junior Highs Schools
Renovation
Bidding
Salt Lake City, UT 84115

Modular Building Systems for School Cafeterias and Dining Halls
Term Contract
Bidding
Taylorsville, UT 84129

American Academy of Innovation Charter School
Addition - 3,285 SF
Post-Bid
South Jordan, UT 84095

Early Light Academy Design-Build Construction Services
Addition - 8,000 SF
Post-Bid
Less than $1,500,000 est. value
South Jordan, UT

General Contractors Pre-Qualification
Results
Less than $600,000 est. value
Sandy, UT

Riverton High School Weight Room Addition
Results
Riverton, UT 84065

Alta High School
Construction
Sandy, UT

Construction: Request for Proposals, Skyline High Rebuild
Construction
Less than $67,000,000 est. value
Granite, UT

Hillcrest High School Replacement Phase 2
Post-Bid
Midvale, UT 84047

Remodel and Security Upgrades at Driggs and Rosecrest Elementary Schools
Renovation
Results
Salt Lake City, UT 84109

Construction: Hunter High Wing Addition
Addition - 42,000 SF
Construction
West Valley City, UT

General Contractors Pre-Qualification
Post-Bid
Sandy, UT 84070

Building 72 Eae Master Plan and Phase 1 Buildout
Results
Less than $328,231 est. value
Salt Lake City, UT

Butler Middle Restroom Remodel
Renovation
Construction
Less than $600,000 est. value
Cottonwood Heights, UT 84121

Glendale Middle School Science Lab
Post-Bid
Salt Lake City, UT 84104

Reported 09/19/2019 12:00 AM
Project Title

Jefferson Jr. Locker Maintenance

Physical Address View project details and contacts
City, State (County) Kearns, UT   (Salt Lake County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Requesting the services of a school locker vender to perform service on existing 800 two hinge/two-point latching Medart school lockers. This includes items such as: • Lubricating all mechanical parts to allow for easier and smoother operation. • Adjusting all latches so doors close and lock easier. • Other needed locker servicing as required.
Details
Division 05 - Metals, Maintenance of Metals, Maintenance of Metal Fabrications.
Division 10 - Specialties, Lockers, Metal Lockers.
Division 11 - Equipment, Maintenance Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents