Last Updated | 06/05/2023 01:27 PM |
Project Title | Proposition 1 - Stillwater Public Schools - 2023 Bond |
Physical Address | View project details and contacts |
City, State (County) | Stillwater, OK 74074 (Payne County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | Elementary School, Middle/Senior High School, Site Development |
Contracting Method | Competitive Bids |
Project Status | Design Development, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $190,000,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project is part of the $195 million bond that was approved by the voters and passed. As of April 20, 2023, further details regarding design and construction timelines have not been identified. The 2023 Bond Issue includes two propositions. Proposition No. 1 is for $190,000,000 to be spent on multiple projects that the district plans to implement if the issue passes, and Proposition No. 2 is for $5,000,000 that the district will use for transportation equipment. The bond funds will provide necessary monies for a new high school to be constructed north of Pioneer Stadium, modernizing the athletics building, maintenance at all sites, academic technology and materials, extracurricular equipment, uniforms, musical instruments, buses, and vehicles. The new two-story high school is planned for the current location of Cimarron Plaza. SPS already owns that property, and they have kept businesses informed of future building plans for that area. Construction is slated for summer 2023. The bond includes plans to renovate or replace portions of the athletic facilities, especially gym spaces and locker rooms that date back to the 1960s. Four competitive lanes will be purchased at the new YMCA facility planned for construction. And new locker room spaces and a weight room facility will be added on to the north side of existing structures along with some rearrangement of spaces. As of June 5, 2023, design team and construction manager has been selected for the proposition 1 projects. Demolition of the high school is scheduled to begin June 2023 and completion September 2026. Other projects will be done throughout the next two years. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |