Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Asian & American Market
New Construction, Demolition, Infrastructure - 19,500 SF
Design
$1,800,000 est. value
Fargo, ND 58103

Stockyards Industrial Development
New Construction, Infrastructure
Design
West Fargo, ND 58078

New Paving Construction
Infrastructure
Bidding
$1,350,815 CJ est. value
Fargo, ND 58102

New Paving Construction
Infrastructure
Bidding
$1,350,815 CJ est. value
Fargo, ND 58102

Traffic Signal Installation
Infrastructure
Sub-Bidding
$260,000 CJ est. value
West Fargo, ND 58078

Traffic Signal Installation
Infrastructure
Sub-Bidding
$260,000 CJ est. value
West Fargo, ND 58078

New Paving and Utility Construction Improvement
Post-Bid
$1,341,041 est. value
Fargo, ND

New Paving and Utility Construction Improvement
Post-Bid
$1,341,041 est. value
Fargo, ND

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Shared Use Path and Driveways, Aggregate Base, Grading, and Incidentals
Results
ND

Sports Complex - Fargo Park District
New Construction, Infrastructure
Construction
$77,000,000 CJ est. value
Fargo, ND 58104

The Arch Phase 2
New Construction, Build-Out, Infrastructure - 188,310 SF
Pending Verification
$31,000,000 est. value
Fargo, ND 58103

Interstate 94 / Fire Station - City Of West Fargo
New Construction, Infrastructure - 30,000 SF
Pending Verification
$10,000,000 CJ est. value
West Fargo, ND 58078

Last Updated 08/08/2022 05:32 PM
Project Title

Southdale Farms Fourth / Fifth Additions

Physical Address View project details and contacts
City, State (County) Horace, ND 58047   (Cass County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $14,647,212 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

NTI Project No. 21.FGO.13159 Project Category Code: Stormwater Improvements, Sewer and Water Construction, Paving (Highway, Road or Street), Landscaping - Seeding, Roadway Lighting, Water/Wastewater Infrastructure, Aggregate, Sidewalks/Curbs/Gutters, Excavation Description: The project shall include the construction of Water, Sewer, Storm and Street Improvement District No. 2022-6 (Southdale Farms Fourth Addition) and Water, Sewer, Storm and Street Improvement District No. 2022-7 (Southdale Farms Fifth Addition); consisting of sanitary sewer mains, sanitary sewer services, watermain, water services, storm sewer, stormwater services, edge drain, hot bituminous asphalt streets, concrete curb and gutter, sidewalk / shared-use path, signage, seeding, lighting, detectable warning panels and and other miscellaneous items. The project will consist of the following items: Unclassified Excavation Seeding and Hydro Mulch/Straw Mulch Aggregate Base Course Class 5 FAA43 Hot Bituminous Pavement Concrete Storm Sewer Various Sizes PVC Sanitary Sewer Various Sizes PVC C900 Watermain Various Sizes Curb & Gutter Street Lighting System Traffic Control and all miscellaneous work necessary therefor and incidental thereto. Bid Result TOTAL BASE BID Section 1 Dakota Undergound Company $12,698,943.4 TOTAL BASE BID Section 2 Dakota Undergound Company $74,309 TOTAL BASE BID Section 3 KPH, Inc. $1,599,242.0

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents