Similar Projects
Grice Hill Park Master Plan - 0000908 - City of Salem
Infrastructure
Conception
$310,000 CJ est. value
Salem, OR 97304

Eola Ridge Park Development, Phase 2 - 0000921 - City of Salem
Infrastructure
Conception
$1,300,000 CJ est. value
Salem, OR 97304

LaCreole Middle School - 2022 Bond - Dallas School District
Renovation, Infrastructure
Design
$10,000,000 CJ est. value
Dallas, OR 97338

Japanese Garden Rebuild - City of Dallas
Infrastructure
Design
$300,000 CJ est. value
Dallas, OR 97338

Clay Street Reservoir Cover Replacement
Infrastructure
Bidding
$450,000 CJ est. value
Dallas, OR 97338

Luckiamute Domestic Water Cooperative Water Supply System Improvements
New Construction, Renovation, Infrastructure
Bidding
$750,000 CJ est. value
Independence, OR 97351

RFP Construction Manager - Student Success Center Project
New Construction, Infrastructure
Post-Bid
$17,300,000 CJ est. value
Monmouth, OR 97361

9th Street Pump Station Improvements - Phase 1
Renovation, Infrastructure
Post-Bid
$950,000 CJ est. value
Independence, OR 97351

2022 Street Rehabilitation Project
Infrastructure
Results
$715,000 est. value
Dallas, OR

2023 Clay Street Valve House Project
Infrastructure
Results
$85,835 CJ est. value
Dallas, OR 97338

Myers Elementary School Expansion and Improvements - 2018 Bond - Salem Keizer Public Schools
Addition, Build-out, Renovation, Infrastructure
Pending Verification
$2,500,000 CJ est. value
Salem, OR 97304

Walker Middle School Expansion and Improvements - 2018 Bond - Salem Keizer Public Schools
Addition, Build-out, Renovation, Infrastructure
Pending Verification
$1,800,000 CJ est. value
Salem, OR 97304

John Barnard Park Construction Project - City of Dallas
New Construction, Infrastructure
Conception
$1,650,000 CJ est. value
Dallas, OR 97338

2nd Street NW Streetscape Improvements - City of Salem
Infrastructure
Post-Bid
$8,330,000 CJ est. value
Salem, OR 97304

Spies Independence Subdivision
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Independence, OR 97351

Last Updated 05/10/2023 08:38 AM
Project Title

Grand Ronde Road (North) Reconstruction

Physical Address View project details and contacts
City, State (County) Grand Ronde, OR 97347   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,273,116 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project area includes the right of way of Grand Ronde Road between Hwy 18 and the Polk County Limits. The work includes, but is not limited to, approximately 8,800 cubic yards of excavation, 17,500 square yards of geotextile fabric installation, 10,600 tons of base aggregate placement, 6,100 tons of ACP Wearing and Base Course (including overlay), 2,800 square yards of Cold Plane Pavement Removal (2.0 inch), and placement of longitudinal pavement markings. The surfaces to be cold planed are Grand Ronde Road, between Hwy 18 and North Street, and the bridge roadway surface. The rest of the roadwayimprovement consist of a full dig out that will require removal and replacement of all existing roadway asphalt subgrade. Project area includes the right of way of Grand Ronde Road between Yamhill County southern limits and Hwy 20. The work includes, but is not limited to, approximately, 2,500 cubic yards of excavation, 2,500 square yards of geotextile fabric installation, 6,000 tons of aggregate base placement, 1,700 tons of ACP Wearing and Base Course (including overlay), and placement of longitudinal pavement markings. The roadway improvement consists of a full dig out that will require removal and replacement of all existing roadway asphalt subgrade. It is expected that the successful Bidder shall meet the highest applicable industry standards in providing this scope of work. For the purposes of the joint agency project between Polk County, Yamhill County and the Confederated Tribes of Grand Ronde, project administration will be conducted by Polk County as Owner. The Owner reserves the right to postpone the award for up to 30 days, to delete certain items from the proposal, and to award the contract to the lowest responsible bidder. The Owner also reserves the right to reject any bid not in compliance with all public contracting procedures and requirements or for good cause upon finding by the Owner that it is the public interest to do so. The estimate is $2.5 - 3 million. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions from bidders should be addressed to Chris Janigo, P.E., at cjanigo@civilwest.net or 541-982-4137 Schedule B: Project area includes the right of way of Grand Ronde Road between Yamhill County southern limits and Hwy 20. The work includes, but is not limited to, approximately, 2,500 cubic yards of excavation, 2,500 square yards of geotextile fabric installation, 6,000 tons of aggregate base placement, 1,700 tons of ACP Wearing and Base Course (including overlay), and placement of longitudinal pavement markings. The roadway improvement consists of a full dig out that will require removal and replacement of all existing roadway asphalt subgrade.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents