Similar Projects
Marion County Airport Runway 4-22 Pavement Rehabilitation
Infrastructure
Bidding
$200,000 est. value
Mullins, SC 29574

Reconstruction/Rehabilitation - District 5
Post-Bid

Reconstruction/Rehabilitation - District 5
Post-Bid

Marion County Inaccessible Roads
Results
Less than $125,202 est. value
Marion, SC

Marion County Roads Damaged by Flooding
Results
Less than $1,380,368 est. value
Marion, SC 29571

Reconstruction/Rehabilitation - District 5
Post-Bid

Preservation - District 5
Results

Safety Improvements- District 5
Infrastructure
Post-Bid

Georgetown Street Resurfacing Project
Results
Less than $150,000 est. value
Marion, SC 29571

Marion Area Schools Re-Surfacing Package
Infrastructure
Post-Bid
Marion, Mullins, SC 29571

Marion County Airport Storm Drainage Rehabilitation
Results
SC

Roadway Improvements
Infrastructure
Post-Bid
Dillon, SC 29536

Rehabilitation/Preservation - I-95
Results

Rehabilitation
Infrastructure
Results

Wilcox Avenue Asphalt Resurfacing Project
Infrastructure
Results
Marion, SC 29571

Last Updated 04/21/2022 08:02 AM
Project Title

Reconstruction/Rehabilitation

Physical Address View project details and contacts
City, State (County) (Dillon, Marion Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bid Number:PCN: P040314 PCN: P040315 PCN: P040417 PCN: P040418 PCN: P040419 PCN: P040420 PCN: P040421 PCN: P040422 PCN: P040423 Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Railroad Insurance And Flagging 001 1.000 Ls Removal & Disposal Of Existing Pavement 650.000 Sy Removal & Disposal Of Existing Curb 135.000 Lf Borrow Excavation 6,889.600 Cy Excavation For Shoulder Paving 102.432 Sta Hauling Of Excavated Shoulder Material 102.432 Sta Cement Modified Recycled Base (12" Unif)-Curing Method b 491,305.203 Sy Portland Cement For Cement Modified Recycled Base Course 14,390.740 Ton Maintenance Stone 36.400 Ton Hma Shoulder Widening Course 512.160 Ton Liquid Asphalt Binder Pg64-22 3,202.559 Ton Full Depth Asph. Pav. Patching 8" Unif 2,515.000 Sy Full Depth Asph. Pav. Patching 10"Unif 1,125.000 Sy Milling Existing Asphalt Pavement 1.5" 1,760.000 Sy Milling Existing Asphalt Pavement 2.0" 48,625.000 Sy Milling Existing Asphalt Pavement (Variable) 2,330.000 Sy Milled-In Rumble Strip 65.720 Mi Hot Mix Asphalt Surface Course Type b 12,679.094 Ton Hot Mix Asphalt Surface Course Type c 37,459.581 Ton Hot Mix Asphalt Surface Course Type d 190.000 Ton Driveway Paving-Surface Type d 1,650.625 Ton Permanent Construction Signs (Ground Mounted) 6,568.000 Sf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 18,930.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 1,065,711.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 4,311.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 42.000 Ea White Word Message "Only"-Fast Dry Paint 6.000 Ea White Combination Arrow(Str.& Rt.Or Str.& Lt.)Fast Dry Paint 6.000 Ea Railroad Crossing Symbols - Fast Dry Paint 27.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 97,785.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 456,405.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 1,825.000 Lf 24" Yellow Diagonal Lines - Fast Dry Paint 570.000 Lf 4" White Broken Lines -(Gaps Excluded) - Epoxy Paint 230.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Epoxy Paint 370.000 Lf 4"Yellow Solid Lines-Pvt.Edge&No Passing Zone - Epoxy Paint 1,250.000 Lf 4" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 6,310.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 355,237.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 1,437.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 14.000 Ea White Word Message "Only" -Thermoplastic - 125 Mil. 2.000 Ea White Combination Arrows(Str&Rt.Or Str&Lt)Thermo-125mil 2.000 Ea Railroad Crossing Symbols - Thermoplastic - 125 Mil. 9.000 Ea 4" Yellow Broken Lines(Gaps Exc)Thermoplastic - 90 Mil. 32,595.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 152,135.000 Lf 24" Yellow Solid Lines - Thermoplastic - 125 Mil. 190.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 208.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 115.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 2,614.000 Ea Removal Of Pavement Markings 31,214.000 Lf Furnish & Install 1.0" Schedule 80 Pvc Conduit 80.000 Lf Furnish & Install 2.0" Schedule 80 Pvc Conduit 150.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 1,616.000 Lf Sawcut For Loop Detector 696.000 Lf f&i-13"x24"x18"d.Elec.Flush Undgrd.Enclos-(Str.Poly.Conc.)Hd 4.000 Ea Concrete Curb And Gutter(2'-0") Vertical Face 110.000 Lf Concrete Curb And Gutter (2'-6") Vertical Face 25.000 Lf Concrete Sidewalk(4" Uniform) 300.000 Sy Detectable Warning Material 125.000 Sf Concrete Driveway(6" Uniform) 100.000 Sy Pedestrian Ramp Construction 250.000 Sy Surface Applied Detectable Warning 12.500 Sf Permanent Grassing For Non-Permitted Resurfacing Projects 21.950 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents