Similar Projects
Exterior Envelope Repairs and Window Replacement Mitchell Hall
Alteration
Bidding
Less than $5,400,000 est. value
Milwaukee, WI 53211

Arts Center Addition Facade and Soffit Repairs
Alteration
Bidding
$1,000,000 est. value
Milwaukee, WI 53211

ADA Handrails at Plamann Park
Post-Bid
Appleton, WI 54913

Remodeling and Repairs at 3936 N 25th Street
Renovation
Post-Bid
Milwaukee, WI 53206

Gates of Heaven Exterior Restoration
Results
$400,000 est. value
Madison, WI 53704

Library Facade Repairs
Results
Less than $135,820 est. value
Milwaukee, WI 53214

Precast Panel Replacement
Alteration
Bidding
$1,600,000 est. value
Madison, WI 53706

Exterior Masonry Envelope Repairs
Renovation - 42,000 SF
Post-Bid
Wausau, WI 54401

Exterior Repairs - Louis Smith Tainter House
Results
Less than $229,000 est. value
Menomonie, WI 54751

Horticulture Head House Facade Repair
Alteration
Bidding
Kenosha, WI 53144

Parking Structure Decorative Panel Replacement
Post-Bid
Milwaukee, WI 53207

Rear Canopy Replacement at Westlawn Gardens Phase 1
Results
Milwaukee, WI

Monona Terrace Exterior Caulking Replacement
Alteration
Bidding
Madison, WI 53703

Highway Salt Shed Roofing, Siding and Repairs
Post-Bid
Plover, WI 54467

Detention Center Sealant Replacement
Results
Kenosha, WI 53144

Reported 07/22/2021 12:00 AM
Project Title

CH Complex Improvements - CJF Caulking Phase 2

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53233   (Milwaukee County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1). Phase 2 would consist of 100% sealant joint replacement on the existing facade limestone panels from the bottom of the third level to the ground level. The exterior joint replacement on the main CJF exterior walls would be accessed by swing stage scaffolding. Exterior joint replacement would include removal of existing joint material, prep joint, install new joint filler as needed, new backer rood (compression seal) and polyurethane sealant (tooled finish). 2). Also Phase 2 would include spall repair on the existing limestone panels, limestone crack repair, replacement of damaged / deteriorated limestone panels that are beyond repair, and replacement of 100% parapet coping sealant joints with new backer rod, sealant , and new lead T-caps Goal TBE:25%

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents