Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$530,000 CJ est. value
Martinsville, OH 45146

Nine Mile Collection System Improvements
Infrastructure
Bidding
$3,348,112 CJ est. value
Batavia, OH 45103

Wastewater System Improvements - Nine Mile Collection System Improvements
Infrastructure
Bidding
$3,348,112 CJ est. value
Batavia, OH 45103

Restore Little Duck Creek at Bramble Park
Post-Bid
$167,000 est. value
Cincinnati, OH

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

ADS, Hancor, Haviland and Baughman Name Brand Plastic Tubing, Pipe and Fittings
Results

Charity Street Reconstruction
Results
$367,269 est. value
Bethel, OH

RFP Engineering - Water Main Replacement 2023 Project Bundle 4
Infrastructure
Pending Verification
$400,000 CJ est. value
Cincinnati, OH 45202

US 52/232 Culvert Construction/Reconstruct/Repair
Infrastructure
Design
$336,697 CJ est. value
Batavia, OH 45103

RFQ D/B - William H. Harsha Lake, Saddle Dam Emergency Access Road Repair, Batavia
Infrastructure
Bidding
$1,000,000 CJ est. value
Batavia, OH 45103

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

2021 Street Repair Program
Results
OH

SR 132/SR 749 Preventive Maintenance
Infrastructure
Design
$2,354,670 CJ est. value
Batavia, OH 45103

Price Road Water Main Replacement
Infrastructure
Bidding
$1,883,925 CJ est. value
Loveland, OH 45140

Last Updated 09/12/2022 03:35 PM
Project Title

Neville-Spur Culvert Replacements and Resurfacing

Physical Address View project details and contacts
City, State (County) Neville, OH 45153   (Clermont County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $132,198 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: Roadway improvements on Neville-Spur Road from west of the bend to the corporation line. The roadway will be milled and filled with spot full-depth repairs. Two existing stone culverts will be removed and replaced. Final Completion Date: October 1, 2023

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents