Similar Projects
Miller Road Self Storage, Flex Space
New Construction
Conception
Clifton Park, NY

Poughkeepsie Storage
New Construction, Demolition - 88,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Poughkeepsie, NY 12601

Rosetti Warehouse
New Construction - 54,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Latham, NY 12110

Mack Studios Addition
Addition - 250,000 SF
Design
Auburn, NY 13021

Construction Work Provide Salt Storage Building
New Construction
Bidding
$2,000,000 to $3,000,000 est. value
Chatham, NY 12037

Loading Dock Alterations
Renovation - 500 SF
Post-Bid
North Tonawanda, NY 14120

21 Drum Hazmat Storage
New Construction
Post-Bid
Westhampton Beach, NY

Batavia Downs Gaming Warehouse
New Construction
Results
$600,000 est. value
Batavia, NY 14020

Montgomery Shared Services Facility
New Construction - 42,250 SF
Results
Fultonville, NY 12072

Beacon HIP Lofts & Storage
New Construction, Renovation, Addition - 555,000 SF
Construction
$8,500,000 est. value
Beacon, NY 12508

President Container Storage
Addition - 98,500 SF
Construction
$7,309,746 est. value
Middletown, NY 10941

Sonwil Distribution Center - Warehouse 2
New Construction - 335,868 SF
Pending Verification
$52,300,000 est. value
Buffalo, NY 14220

Wildflower Studios
New Construction
Pending Verification
Astoria, NY

Extra Space Storage
New Construction - 160,900 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Pearl River, NY 10954

Exit 9 Self Storage - Phase II
New Construction - 37,526 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Clifton Park, NY 12065

Last Updated 05/25/2022 07:30 AM
Project Title

Town of Colton - Salt Storage Facility

Physical Address View project details and contacts
City, State (County) Watertown, NY   (Jefferson County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $63,000 to $588,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

General Construction - $588,000.00 Electrical - $63,000.00 The Project consists of constructing a wood-framed sand and salt storage building founded on cast-in-place concrete foundations. The Project includes installation of an electrical power service from the existing Highway Garage to the new building, and lights, outlets, and other electrical appurtenances.

Details

Warehouse/Storage, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents