Similar Projects
Channel Improvement, Baleshed Landing Dikes 2,3, and 4, Dike Construction
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Forest, MS 39074

RFP Homeowner Rehabilitation/Reconstruction
Infrastructure
Bidding
Forest, MS 39074

Water System Improvements Project
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Forest, MS 39074

Roosevelt State Park Cabins 8 and 12
New Construction
Post-Bid
Morton, MS 39117

Construction of the 2022 Roadway Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Morton, MS 39117

Reseal on County Roads A - K
Infrastructure
Results
$2,146,152 est. value
Forest, MS

Mill and Overlay Approximately 8 miles on SR 35
Infrastructure
Results
Less than $10,000,000 est. value
MS

Amazon Pearl River Solar Farm / Scott County
New Construction, Infrastructure
Construction
$235,000,000 CJ est. value
Morton, MS 39117

Amazon Pearl River Solar Farm / Scott County
New Construction, Infrastructure
Construction
$235,000,000 CJ est. value
Morton, MS 39117

Front Street Bank Stabilization
Infrastructure
Bidding
$500,000 CJ est. value
Forest, MS 39074

Raytheon Water Well
Infrastructure
Post-Bid
$300,000 CJ est. value
Forest, MS 39074

2022 Roadway Improvements
Infrastructure
Results
$1,709,212 CJ est. value
Morton, MS 39117

City Parks Splash Pads Project
Infrastructure
Bidding
$100,000 CJ est. value
Forest, MS 39074

Box Bridge and Approaches on Denson Road
Infrastructure
Post-Bid
$500,000 CJ est. value
Morton, MS 39117

Construction of a water well modification
Infrastructure
Results
$254,300 CJ est. value
Forest, MS 39074

Last Updated 06/05/2023 03:46 PM
Project Title

Edgewood Park Trail Project

Physical Address View project details and contacts
City, State (County) Forest, MS 39074   (Scott County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of constructing a 1,324-foot long asphalt walking trail in Edgewood Park in McComb, MS. Specific locations and improvements are shown in the Contract Drawings. The above general summary of features of the work does not in any way limit the responsibility of the Contractor to perform all work and furnish all plant, labor, equipment, and materials required by the specifications and the drawings referred to therein. Contract time shall be 90 calendar days from the effective date shown in the Notice to Proceed. Liquidated damages will be assessed at a rate of $200.00 per day for each consecutive calendar day the work has not achieved Substantial Completion. The Owner reserves the right to waive any formalities or to reject any and all bids. A 5% bid bond will be required on this project. The successful bidder shall furnish a Performance Bond and a Payment Bond each in the amount of 100% of the bid. Attorneys-in-fact who sign Payment Bonds must file with each bond a certified and effective dated copy of their power of attorney.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents