Similar Projects
Northern Plains Nitrogen Fertilizer Plant
New Construction, Infrastructure
Conception
$200,600,000 CJ est. value
Grand Forks, ND 58202

Soybean Crush Plant Mixed Use Development / Grand Forks
New Construction, Infrastructure
Design
$400,000,000 CJ est. value
Grand Forks, ND 58201

Soybean Crush Plant Mixed Use Development / Grand Forks
New Construction, Infrastructure
Design
$400,000,000 CJ est. value
Grand Forks, ND 58201

Main Street - Mill and Pave
Infrastructure
Bidding
$400,000 CJ est. value
Grand Forks, ND 58201

UND SMHS - Minot Drainage Improvement
Infrastructure
Bidding
$400,000 CJ est. value
Grand Forks, ND 58203

Grand Forks Public Schools - Central Kitchen
Addition, Demolition, Build-out, Infrastructure - 7,750 SF
Sub-Bidding
$6,000,000 CJ est. value
Grand Forks, ND 58201

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Career Impact Academy
New Construction, Infrastructure - 56,900 SF
Post-Bid
$28,000,000 CJ est. value
Grand Forks, ND 58201

Recycled HBP Overlay & Milling Surface County Road #6
Infrastructure
Results
$1,462,847 CJ est. value
Grand Forks, ND 58201

West Elementary Redevelopment
Infrastructure
Results
$337,309 CJ est. value
Grand Forks, ND 58203

Roundabout - City Of Grand Forks
Infrastructure
Pending Verification
$860,000 CJ est. value
Grand Forks, ND 58203

The Listen Center
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Grand Forks, ND 58201

Spectra Health Parking Lot & Access Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Grand Forks, ND 58201

Montogomery Field Improvement
Infrastructure
Post-Bid
$600,000 CJ est. value
Grand Forks, ND 58201

Service to Climax East Central Regional Water District
Infrastructure
Results
$9,877,273 CJ est. value
Thompson, ND 58278

Last Updated 01/04/2024 08:40 AM
Project Title

LS 49 Forcemain

Physical Address View project details and contacts
City, State (County) Grand Forks, ND 58201   (Grand Forks County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $523,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Description: Bids for Project 8476.04, construction of LS 49 Forcemain, will be received until 2:00 p.m. local time on January 18, 2024. For this project, bids will only be received and accepted through the online electronic bid service through QuestCDN.com. To access the electronic bid form, download the project documents and click on the online bid button at the top of the bid advertisement page. Prospective bidders must be on the Planholder list through QuestCDN for bids to be accepted. The scope of work generally consists of the following: 1,547 LF of 12" PVC force main, bypass riser, force main drain down, tapping sleeve, connection to existing force main, new 12" gate valves, grass restoration, and miscellaneous Work. Bids will be both unit price and lump sum price. All work is to be in accordance with the Bidding Documents which are on file in the office of the City Engineer, Grand Forks, North Dakota, reference to which is made for detailed description of the work. Each bid must be accompanied by a separate PDF document (uploaded to Quest VirtuBid) containing an acceptable bidder's bond in a sum equal to five percent of the full amount of the bid, executed by the bidder as principal and by a surety, conditioned that if the principal's bid be accepted and the contract awarded to the principal, the principal, within ten days after notice of award, will execute a contract in accordance with the term of the bid and a contractor's bond as required by law and the regulations and determinations of the Grand Forks City Council. Each bid shall also contain a PDF document (uploaded to Quest VirtuBid) of the Contractor's License or certificate of renewal thereof issued by the Secretary of State which will be uploaded. Bidder must be licensed for the full amount of the bid. No bid will be read or considered which does not fully comply with the above provisions as to bond and license. Bidders are required to comply with Davis-Bacon prevailing wage requirements. Bidders on this work will be required to comply with American Iron and Steel requirements of the Consolidated Appropriations Act, 2014. The requirements for bidders and contractors under this regulation are explained in the specifications. All questions about the meaning or intent of the Bidding Documents are to be directed to the Engineer and shall be submitted to: Mr. Ben Williams, PE Principal Engineer Webster, Foster, & Weston 1616 Mill Road Grand Forks, North Dakota 58203 ph: (701) 775-8118 Question Deadline 01/11/2024

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents