Similar Projects
Wendell Place Apartments
New Construction
Conception
Wendell, NC

Abbey Spring
New Construction
Conception
Apex, NC 27502

Hampton Spring
New Construction
Design
Raleigh, NC

Capitol Boulevard Mixed Use
New Construction - 1,700,000 SF
Design
Raleigh, NC

RFP Construction Manager at Risk - Reedy Creek Laboratory Campus Expansion and Renovation Project
Addition, Demolition, New Construction, Renovation, Infrastructure
Bidding
$32,694,966 CJ est. value
Raleigh, NC 27607

Microsurfacing Treatment
Infrastructure
Bidding
$5,000,000 CJ est. value
Apex, NC 27523

Airport Boulevard Sidewalk Project
Infrastructure
Post-Bid
$500,000 est. value
Morrisville, NC 27560

Request to Prequalify Vendors For Residential Asbestos Abatement Services
Term Contract, Infrastructure
Post-Bid
$200,000 CJ est. value
Raleigh, NC 27603

Annual Street Resurfacing Project
Results
Raleigh, NC

Archives and History Building Foundation Repairs and Drainage Improvements
Renovation, Infrastructure
Results
$965,000 CJ est. value
Raleigh, NC 27601

Davis Drive Apartments
New Construction - 107,950 SF
Construction
$15,000,000 est. value
Morrisville, NC

Walnut Trace
New Construction
Construction
Raleigh, NC

The Exchange Raleigh - Future Phases
New Construction, Infrastructure - 125,000 SF
Pending Verification
$850,000,000 CJ est. value
Raleigh, NC 27609

The Exchange Raleigh - Future Phases
New Construction, Infrastructure - 125,000 SF
Pending Verification
$850,000,000 CJ est. value
Raleigh, NC 27609

Lane-Idlewild Affordable Housing
New Construction
Conception
Raleigh, NC 27601

Last Updated 10/18/2022 11:07 AM
Project Title

Crabtree Village Phase 2

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27612   (Wake County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $55,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of a five and six story apartment building at 5201 and 5301 Homewood Banks Drive. As of February 25, 2022, the project is in design stage and seeking rezoning and administrative site review approval from the Raleigh City Council. A meeting is tentatively planned for April 5, 2022. The Planning Commission recommended approval on February 22, 2022. The architect has been chosen. The developer will likely serve as general contractor. A construction timeline has not been determined but is not expected to begin before the fourth quarter of 2022.

Details

202,786 SF - 5 Stories Above Grade, 202,786 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents