Similar Projects
54th Street Lift Station Capacity Improvement Program
New Construction
Results
Enid, OK 73701

Guymon Lift Station 6 Replacement Project
Renovation
Bidding
Guymon, OK

2020 CDBG Reap Water System Improvements
Infrastructure
Results
$176,958 est. value
Ryan, OK

Construction for Sewer Force Main Improvements
New Construction, Infrastructure
Results
Moore, OK 73165

Sheridan Road Booster Pump Station
New Construction, Infrastructure
Post-Bid
Collinsville, OK 74021

Fire Station Lift Station
Infrastructure
Results
Mustang, OK

Greens Lift Station and Forcemain Improvements
Renovation, Infrastructure
Post-Bid
Broken Arrow, OK 74012

Atoka Pump Station Vault and Duct Bank Replacement
Alteration
Results
$968,629 est. value
Oklahoma City, OK

Sewer Force Main Improvements - HDPE Pipe and Plug Valve
Infrastructure
Results
Moore, OK

Raw Water Pump Station Rehabilitation
Renovation
Results
$1,200,000 est. value
Muskogee, OK

Last Updated 01/10/2022 10:04 AM
Project Title

Battle Creek Tank Inlet-Outlet Modifications and 12 Inch Suction Line Project B

Physical Address View project details and contacts
City, State (County) Broken Arrow, OK 74011   (Tulsa County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes installation of approximately 2,400 linear feet of 12-inch irrigation pump station suction piping from the Battle Creek Tank to the Battle Creek Gold Course Irrigation Pump Station and construction of three (3) cast-in-place valve vaults and associated piping at the Battle Creek Tank Site. A related project titled Battle Creek Gold Course Irrigation Pump Station Replacement (Project A) will include construction of a new Battle Creek Golf Course Irrigation Pump Station.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents