Similar Projects
New Court Administrative Building
New Construction - 28,000 SF
Conception
$13,662,000 est. value
Graham, NC

Public Buildings Bond Projects
Renovation
Conception
$3,750,000 est. value
Monroe, NC

Price Hall Renovation - Phases 1 and 2
Renovation
Bidding
$16,500,000 est. value
Greensboro, NC

Town Campus Public Service and Parks and Recreation Building and Town Hall Building
Renovation
Bidding
$17,000,000 est. value
Waxhaw, NC

New Town Hall
New Construction - 9,000 SF
Post-Bid
Summerfield, NC

City Hall - 1st Floor Family Restroom
Addition - 80 SF
Post-Bid
Asheville, NC 28801

Alton Lennon Courthouse Disaster Relief Project
Results
$40,000,000 to $50,000,000 est. value
Wilmington, NC 28401

Lincoln County Courthouse
Results
Lincolnton, NC 28092

Pender County Courthouse - Interior Renovations
Construction
Burgaw, NC 28425

Forsyth County New Courthouse and Administrative Building
New Construction - 250,000 SF
Construction
Less than $96,000,000 est. value
Winston-Salem, NC 287101

Lee County Judicial Building (Historic Courthouse/ Firehouse) - Lee County
Renovation
Conception
$27,877,000 est. value
Sanford, NC

Law Enforcement Training Center Driver Training Classroom
New Construction - 3,165 SF
Bidding
$2,000,000 est. value
Raleigh, NC

Structural Repairs Mann Hall
Term Contract
Post-Bid
$3,000,000 to $5,000,000 est. value
Raleigh, NC 27607

Wake County Courthouse 3RD Floor County Attorney`s Suite
Renovation
Results
Raleigh, NC 27600

Marvin Village Hall
New Construction
Construction
Marvin, NC

Last Updated 06/23/2022 09:02 AM
Project Title

Henderson County Courthouse

Physical Address View project details and contacts
City, State (County) Hendersonville, NC 28792   (Henderson County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids.
Project Status Design Development, Construction Start Expected May 2024, Construction Completion Expected April 2027
Bids Due View project details and contacts
Estimated Value $76,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work includes the new construction of a six story annex building. As of June 22, 2022 this project is currently in early design. The architect has been selected. It is unclear at this time how a general contractor will be selected. Construction is not scheduled to begin before May of 2024 and will go until April of 2027. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Capitol/Court House/City Hall, 6 Stories Above Grade, 94,315 SF New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents