Similar Projects
University Boulevard at Rouse Road Intersection Improvements
Bidding
$1,381,618 est. value
Orlando, FL 32800

Texas Avenue Roadway Improvements (from North of Duskin Avenue to South of Holden Avenue)
Infrastructure
Bidding
$20,485,221 est. value
Orlando, FL 32839

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Concrete and Asphalt Restoration Services
Infrastructure
Post-Bid
Orlando, FL

SR 417 Widening from International Drive to John Young Parkway
Results
$88,000,000 est. value
Orlando, FL 32807

West Oakland Avenue and North Cumberland Avenue Reconstruction - Phase 1 and Lakewood Avenue and East Oakland Avenue Construction
Results
Less than $1,600,000 est. value
Ocoee, FL 34761

Buena Vista Drive North - Median Closure
Construction
Orlando, FL 32800

SheltAir FBO Parking Lot Expansion
Addition
Construction
Orlando, FL 32803

Silicone Joint Sealer
Infrastructure
Bidding

Cold In-Place Bituminous Base Recycling with Asphalt Resurfacing
Term Contract
Post-Bid
$13,057,755 est. value
Orlando, FL

Asphalt Rejuvenating Agent
Results
Less than $600,000 est. value
Orlando, FL 32802

SR 451 Resurfacing from SR 414 to US 441
Infrastructure
Bidding
FL

Evaluation of Enhanced-Friction Asphalt Overlays and Surface Treatments
Infrastructure
Post-Bid

Asphalt Repair
Results
Less than $500,000 est. value

Intersection Improvement/Traffic Signals/Milling and Resurfacing/Sidewalk/Drainage Improvements - SR 436
Infrastructure
Bidding
$1,537,264 est. value
FL

Last Updated 03/22/2022 03:46 PM
Project Title

Cove Drive and Sol Avenue Roadway Improvements Project

Physical Address View project details and contacts
City, State (County) Belle Isle, FL 32812   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $492,289
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of milling and repaving the asphalt roadway and adjacent side streets within the project limits, excavating and replacing base course material, and installation of storm slot channel drains and associated piping.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents