Similar Projects
Richmond Regional Juvenile Detention Center Renovation
Term Contract, Demolition, New Construction, Renovation, Infrastructure
Bidding
$10,702,952 CJ est. value
Rockingham, NC 28379

NC 133 and Old River Road
Infrastructure
Bidding
$3,000,000 CJ est. value
Belville, NC 28451

Concrete for 5th Street BAA Project
Alteration
Post-Bid
Roanoke Rapids, NC 27870

Fiscal Year 2022 Concrete Repair Project
Alteration
Post-Bid
Morrisville, NC

Mclin Creek Outfall Reconstruction
Results
Claremont, NC

Repairs SPG-2 Concrete B4753
Term Contract
Results
$25,000 est. value
Cherry Point, NC 28533

Construction of Clay County 911 Center
New Construction, Infrastructure - 5,200 SF
Pending Verification
$3,552,048 CJ est. value
Hayesville, NC 28904

New Above Ground (Self-Serve) Fuel Farm Installation (AST)
Infrastructure
Bidding
$670,000 CJ est. value
Maxton, NC 28364

Concrete for Eno River
Alteration
Post-Bid
Durham, NC

Vest Water Treatment Plant (Wtp) Concrete Repairs
Alteration
Results
Charlotte, NC

RFB-Williamsburg Parkway Unsuitables
Infrastructure
Bidding
$250,000 CJ est. value
Jacksonville, NC 28540

Concrete Installation at OT Sloan T-Ball Complex
Alteration
Post-Bid
Sanford, NC 27330

Ready Mix Concrete
Alteration
Results
Rockingham, NC

FY 22/23 Resurfacing Contract
Infrastructure
Bidding
$1,000,000 CJ est. value
Indian Trail, NC 28079

Ready Mix Concrete
Term Contract
Post-Bid
Boone, NC

Last Updated 06/05/2023 10:12 AM
Project Title

Can Opener / Durham

Physical Address View project details and contacts
City, State (County) Durham, NC 27701   (Durham County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Bids by Invitation
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

This is a renovation of a 2,400 SF block building for a Taproom. There is a new roof deck extension that will be supported by structural steel adjacent to the existing building. Adjacent areas are also included. We are waiting to receive some revised drawings soon. As of June 2, 2023, the building permit was issued in April of 2023, however, no inspections have been completed thus far. A general contractor has been selected. While a firm construction timeline is unknown at this time, construction is expected to begin in June of 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade, 15,435 SF.
Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents