Similar Projects
Highway 98 Median and Right of Way Landscaping - 2020
Term Contract
Post-Bid
De Funiak Springs, FL 32433

Mowing
Post-Bid
Less than $220,000 est. value

Roadside Maintenance
Results
Chipley, FL 32428

Grassing, Seeding and Sodding
Results
Less than $75,114 est. value
FL

Landscaping
Results
Less than $495,258 est. value
FL

Mowing
Results
Less than $315,792 est. value
FL

Landscape
Results
Less than $250,000 est. value

Tree Cutting/Trimming
Results
Less than $200,000 est. value

Mowing
Results
Less than $19,818 est. value
FL

Tree Cutting
Results
Less than $250,000 est. value

Landscape
Results
Less than $916,892 est. value
FL

Fertilizer
Results
Less than $160,000 est. value

Landscape Maintenance
Results
$350,000 est. value

Landscape Maintenance
Results
$250,000 est. value

Last Updated 04/09/2021 05:02 AM
Project Title

Herbicide Application

Physical Address View project details and contacts
City, State (County) (Holmes, Walton, Washington Counties)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract consist of the furnishing and application of herbicides to treat undesirable roadside vegetation along designated primary and interstate roadways at various locations within Holmes, Walton, and a portion of Washington Counties. Section 0001 Large Machine Mowing (Ac) e104- 4- 1 Mowing (Regular/Large Machine) Ac 10.000 e104- 4- 3 Mowing (Small Machine) Ac 5.000 e580-332- 99 Tree And Brush Removal Ac 2.000 e580-337- 2 Herbicide (Strip Application) Ac 2.000 e580-337- 3 Herbicide (Spot Application < 100 Sf) Sf 6,000,000.000 e580-337- 4 Herbicide (Strip Application)(Aquatic) Ac 2.000 e580-337- 14 Herbicide, Hand Application- Frill And Girdle Application, Trees 4" And Greater Ea 12.000 e580-337- 15 Herbicide, Hand Application- Areas 100-1000 Sf Sf 1,650,000.000 e580-337- 16 Herbicide, Basal Bark Application- Areas 100-1000 Sf Sf 1,000.000

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents