Similar Projects
Mccormick House HVAC System Replacement
Post-Bid
Harrisburg, PA 17110

Capitol Complex – Automation System Upgrades
Post-Bid
Less than $3,200,000 est. value
PA

Primary Center Gymnasium HVAC Upgrades
Results
Less than $124,800 est. value
Hershey, PA

Granada Building Chiller Replacement
Results
Hershey, PA

Hershey Elementary School Chiller Replacement
Post-Bid
Hershey, PA 17033

Hershey Middle School Boiler Heat Exchanger Replacement
Results
Hershey, PA 17033

HVAC and Mechanical Products
Term Contract
Post-Bid

Farm Show Complex - Upgrade Facilities (HVAC Construction)
Results
$3,000,000 to $5,000,000 est. value
Harrisburg, PA 17110

Capitol Complex Central Plant Steam Tunnel Repairs - HVAC Construction
Post-Bid
$400,000 to $500,000 est. value
Harrisburg, PA 17100

Construction of a 3,280 SF Pole Building - HVAC Construction
Results
$25,000 est. value
Harrisburg, PA 17109

Friendship Community Center HVAC Roof Top Unit Upgrades- Phase 2
Results
$320,000 to $380,000 est. value
Harrisburg, PA 17112

Middletown Train Station HVAC Contracting
Results
$200,000 to $499,999 est. value
Middletown, PA 17057

Forum Building - Construction and Related Improvements - HVAC Construction
Results
Less than $10,000,000 est. value
Harrisburg, PA 17120

Royalton Borough Building HVAC Upgrades
Results
$25,000 est. value
Royalton, PA 17057

CAT Operations Facility – Interior Renovations Project (HVAC)
Results
Harrisburg, PA 17104

Reported 07/11/2020 12:00 AM
Project Title

Chiller Replacement – 22nd and Forster Streets Facility

Physical Address View project details and contacts
City, State (County) Harrisburg, PA 17103   (Dauphin County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $400,000 to $600,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Demolish existing chiller, pumps, piping and concrete pump pads in mechanical room. 2. Provide new chiller, pumps, concrete pump pads, piping and patch flooring in mechanical room. 3. Replace control valves at all air handling units. 4. Integrate new systems into the existing BMS. The Bid for Electrical construction contract .4 includes: 1. Demolish electrical feeders for chiller and pumps back to panel. 2. Provide new electrical feeders to new equipment. Estimated Range: HVAC - $400,000 to $600,000; Electrical - $50,000 to $100,000

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents