Similar Projects
Hidden Lake Park Paving
Post-Bid
Merrillville, IN 46410

Engineering Services for 2021 Site Improvements @ Haley Elementary School
Post-Bid
Fort Wayne, IN 46802

Downtown Parking Lot Renovation
Renovation
Results
Highland, IN 46322

2020 CCMG Street Improvement
Renovation
Results
Highland, IN 46322

Apple Road Resurfacing
Post-Bid
Osceola, IN 46561

Community Crossing Street Resurface Program
Results
Lake Station, IN 46405

Marengo Industrial Park Roadway Engineering Services
Post-Bid
Marengo, IN 47140

Community Crossings 2020 Street Repair and Resurfacing
Results
Kouts, IN 46347

Street Resurface & Repair
Post-Bid
Winona Lake, IN 46590

Median Construction
Results
Hammond, IN 46320

109th Avenue at Colorado Street Road Construction
Post-Bid
Crown Point, IN 47283

Concrete Pavement Restoration and Bridge Deck Overlay
Results
IN

Joint Sealing System
Post-Bid
Indianapolis, IN 46077

Concrete Pavement Restoration
Results
IN

Tincher Road Resurfacing
Post-Bid
Mooresville, IN 46158

Reported 08/17/2021 12:00 AM
Project Title

Huntington County Community Crossing

Physical Address View project details and contacts
City, State (County) Huntington, IN   (Huntington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

HMA Mill, Patch, & Overlay of CR 500N and Full Depth Reclamation & Overlay of CR 600W (INDOT DES 2100395) Huntington County, Indiana The work shall consist of the Asphalt Mill, Patch and HMA overlay of CR 500N from SR 5 to CR 635W & Full Depth Reclamation and HMA Overlay of CR 600W from CR 200N to Division Rd. This work will also include cleaning of the project areas and all other work necessary to provide for a complete project and as included in the Construction Schedule and Specifications for the overlay of these roads. The total length of all roadways in this project is 5.12 miles.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents